<record><leader>00993nam a0000133ua 124 </leader><controlfield tag="001">1833_1</controlfield><controlfield tag="008">130507 2013                             </controlfield><datafield ind1=" " ind2=" " tag="100"><subfield code="a">Trandem, Ame</subfield></datafield><datafield ind1=" " ind2=" " tag="245"><subfield code="a">Dodgy Deal</subfield><subfield code="b">Lower Sesan 2 Dam Project</subfield></datafield><datafield ind1=" " ind2=" " tag="260"><subfield code="b">International Rivers</subfield><subfield code="a">Cambodia</subfield><subfield code="c">Apr 2013</subfield></datafield><datafield ind1=" " ind2=" " tag="300"><subfield code="a">4 p</subfield></datafield><datafield ind1=" " ind2=" " tag="500"><subfield code="a">Cambodia and Vietnam initially started talking about the possibility of building this dam in August 2006. In 2007, a memorandum of  understanding between Cambodia's Ministry of Industry, Mines and Energy and Electricity of Vietnam was signed, including the  undertaking of an environmental impact assessment and a feasibility study for the Lower Sesan 2 project. Study on this dam began in  2008 by EVN with Key Consultants Cambodia (KCC) conducting the Environmental Impact Assessment, and Power Engineering Consulting  Company 1 (PECC-1) responsible for developing the resettlement and compensation policy.</subfield></datafield><datafield ind1=" " ind2=" " tag="653"><subfield code="a">Lower Sesan</subfield><subfield code="a">001</subfield></datafield><datafield ind1=" " ind2=" " tag="856"><subfield code="u">CatalogueRecords/lower_sesan_2_dam_project.pdf</subfield><subfield code="y">Download PDF</subfield></datafield></record>