-
[Draft] Completed Environmental and Social Impact Assessment on Koh Krabey Resort Development Project of R.P.B Investment Co., Ltd
The specific objectives of the full environmental and social impact assessment study on the Koh Krabey Resort Development Project are: 1. Study the existing biological environm...
-
[Draft] Initial Environment and Social Impact Assessment on quarry business of Black Diamond Stone SJC Co., Ltd
The objectives of the Initial Environment and Social Impact Assessment are - To ensure doing business in the long term with sustainability. - Explore the existing environmenta...
-
[Draft] Initial environmental and social impact assessment on the project to build the optic cable
Initial environmental and social impact assessment of the 1,085-km-long optic cable project, taking a sample of 2.6 km on the right side of street 380 in Preaek Ta kov commune, ...
-
[Draft] Environmental and social impact assessment on the completed project of Cambodia optical cable network in 5 target provinces
Environmental and Social Impact Assessment on the completed project of Cambodia optical cable network in 5 target provinces along street 135 in Chhouk district, Kampot province,...
-
Environmental Impact Assessment on Diversion Route Lower Yuam Reservoir -- Bhumibol Reservoir: Executive Summary Report
Under the Feasibility Study: Environmental Impact Assessment, Public Relations and Public Hearing of the Bhumibol Reservoir Inflow Augmentation Project, Panya Consultants Co., L...
-
[Draft] Initial environmental and social impact assessment : Kamchay hydroelectric project in Kampot province
The Shinohydro is one of the leading company to utilize the water for producing electricity that has 10 subsidiaries and 70 network companies. The company won the international ...
-
[Draft] Environmental impact assessment for Lower Sesan 2 hydropower project in Stung Treng province, Cambodia
The length of the main dam is 8km with crest 83m above the sea level and 40m above the river. The Lower Sesan II is located in Sesan district, Stung Treng province, Cambodia a...
-
[Draft] Copy of environmental impact assessment report for Lower Sesan 2 hydropower project in Stung Treng province, Cambodia
The main purpose of the Lower Sesan II hydropower project is to meet the medium and long-term energy needs of the Kingdom of Cambodia, as well as to export some energy in excess...
-
Complete environmental impact assessment report for Lower Sesan 2 hydropower project in Stung Treng province, Cambodia (Final report)
The main purpose of the Lower Sesan II hydropower project is to meet the medium- and long-term energy needs of the Kingdom of Cambodia, as well as to export some energy in exces...
-
[Draft] Preliminary Environmental Impact Assessment: Exploration and Exploitation Project of Ilmenite
Samnang Re Tbong Thmor Import Export and Development Co., Ltd. conducted a preliminary environmental impact assessment under the exploration and exploitation project of ilmenite...
-
[Draft] Preliminary environmental and social impact assessment: Project investment on agro-industrial plantation (rubber)
Tan Bien Kampong Thom Aphivath Caoutchouc co., ltd issued an environmental and social impact assessment in purpose of assuring sustainability of rubber plantation. The aims of ...
-
Myanmar Pongpipat Co., Ltd._Scoping Report for EIA of Heinda Mine
This scoping report is prepared for ESIA of Heindamine Mine near Heinda Village, Myitta Township, Tanintharyi Region. The project proponent is Myanmar Pongpipat Co., Ltd. and th...
-
Production and Sale Sharing Contract for Gems in Lone Khin/ Hpa Kant Gems FIelds
This contract would be signed between Myanmar Gems Enterprise under the Ministry of Natural Resources and Environmental Conservation, for the production and sale of gems in Lone...
-
Production Sharing Contract Model for the Exploration and Production of Petroleum for Onshore Block
The contract is a model of what would be signed between Myanmar Oil and Gas Enterprise under the Ministry of Electricity and Energy, and the Contractor, for the exploration and ...
-
Mineral Exploration Contract Models
There are two contracts as part of this dataset. The first is a contract that would be signed between the Department of Mines under the Ministry of Natural Resources and Environ...
-
Myanmar International Terminals Thilawa limited (MITT)_Environmental Management Plan for Port Terminal in Thilawa
This EMP is prepared for Port Terminal Operation by MITT to submit to ECD in January 2020, as per Myanmar Investment Commission (MIC). The total land area of the project is 75 h...
-
Dawei Development Public Co., Ltd. (DDPC)_Initial Environmental Examination for Orchid Garden Resort near Maung Ma Kan Beach
This IEE is prepared for Orchid Garden Resort, in Maung Ma Kan Village, Laung Lone Township, Tanintharyi Region, according to the Environmental Conservation Law (2012) and Envir...
-
TTCL Power Myanmar Company Limited (TPMC)_ESIA for LNG Power Plant (Ahlone) in Yangon
This Environmental and Social Impact Assessment (ESIA) will only cover the LNG Receiving Terminal, Pipeline, and Power Plant; while an Initial Environmental Examination (IEE) fo...
-
June Cement Industry Ltd._Initial Environmental Examination for Clay Soil Production Project in Kyaikmaraw Township
This IEE report is prepared by 3rd party, E Guard Environmental Services Co., Ltd. for June Cement Industry Ltd. for the project of Clay Soil Production located at Near Kaw Pa N...
-
Environmental Compliance Certificate - ECC_Fresh Idea Co., Ltd.
This ECC is granted to Fresh Idea Co., Ltd. for gold extraction project: SGU-273 by MONREC, subject to the conditions for general, environmental quality standards, emissions and...