Wunna & Sons Co., Ltd._Environmental Management Plan
This Environmental Management Plan is prepared to extend the period of the license of gold extraction in site: SGU-260 (12 Acres) in Pyin Oo Lwin District, Mandalay Region, for ...
-
Shwe Soon Thaik Co., Ltd.
The company is set up in 2013 and this Environmental Management Plan is prepared to extend the license period- 1 year, for gold extraction at site: KWM-109 in Myitkyina Town, Ka...
-
Htat Yee Linn Mining & Refinery Co., Ltd._Initial Environmental Examination
This Initial Environmental Examination Report is prepared to extend the period of the license of gold extraction in site: SGU-6A in Pyin Oo Lwin District, Mandalay Region. The c...
-
Myanmar Pongpipat Mining Co., Ltd._Scoping Report of EIA for Heinda Mine
This scoping report is prepared by Ever Green Tech Environmental Services and Training Co., Ltd for Myanmar Pongpipat Co., Ltd., for EIA of Heinda Mine in Heinda Village, Myitta...
-
Pyi Daung Su Thar Co., Ltd._YMT-255
Pyi Daung Su Thar Co., Ltd. has started the small-scaled gold extraction in Yamethin District, Mandalay Region, Myanmar in June 2014, with the approval of Ministry of Natural Re...
-
Pyi Daung Su Thar Co., Ltd._YMT-257
Pyi Daung Su Thar Co., Ltd. has started the small-scaled gold extraction in Yamethin District, Mandalay Region, Myanmar in June 2014, with the approval of Ministry of Natural R...
-
Y Complex Co., Ltd._Environmental Impact Assessment for Y Complex Project
This report has been prepared by a third party, E Guard Environmental Services Co., Ltd. for Y Complex Co., Ltd. for the project of Y Complex Project located at Plot No. 11-A/15...
-
Wuxi Hua Guang (Myanmar) Co., Ltd._Environmental and Social Impact Assessment for Tigyit Coal Fired Power Plant
As per EIA Procedures (2015), this ESIA report for Tigyit coal-fired power plant (120 MW) to identify and evaluate the potential impacts from the operation of the power plant. T...
-
Shwe Pyae San Yar Co., Ltd._Initial Environmental Examination
This Initial Environmental Examination Report is prepared to apply the license of gold extraction in Kyauk Gyi Township, Bago Region for a year.
-
[Draft] Environmental impact assessment for feasibility study of Lower Sesan 2 hydropower project, Stung Treng province, Cambodia
The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Trans...
-
[Draft] Environmental and social impact assessment: Stung Atay hydro-electric BOT project in Veal Veng district, Pursat province
C.H.D is one of the largest Chinese companies in the world working on saving and conserving water resources to generate electricity. The company will develop the hydroelectric d...
-
[Draft] Initial environmental and social impact assessment: Koh Pos project in Preah Sihanouk province
The Morokot project is invested by Koh Pos (Cambodia) Investment Group LTD which is the Russian company and receives the Koh Pos lease concession for 99 years from 25 September ...
-
[Draft] Copy of environmental impact assessment report for Lower Sesan 2 hydropower project in Stung Treng province, Cambodia
The main purpose of the Lower Sesan II hydropower project is to meet the medium and long-term energy needs of the Kingdom of Cambodia, as well as to export some energy in excess...
-
Environmental and social impact assessment: Kamchay hydroelectric project in Kampot province
The Shinohydro is one of the leading company to utilize the water for producing electricity that has 10 subsidiaries and 70 network companies. The company invests in constructio...
-
[Draft] Environmental and social impact assessment: Agro-industry project of HLH Agriculture (Cambodia) Co.,Ltd in Kampong Speu province, Cambodia
HLH Agriculture (Cambodia) Co.,Ltd. is a limited liability individual enterprise. The company is registered with the Ministry of Commerce with an initial registered capital of ...
-
License of small scale mineral production for Shwe Sin Moe Co., Ltd.
Approval for small-scale gold extraction issued by the Ministry of Natural Resources and Environmental Conservation for the period from 4 Dec 2016 to 17 Jan 2017. But EMP is pre...
-
License_Pyi Daung Su Thar Co., Ltd._YMT-257
Approval for small-scale gold extraction issued by the Ministry of Natural Resources and Environmental Conservation for the period from 4 Dec 2016 to 17 Jan 2017. But EMP is pre...
-
SN Power_ESIA of Middle Yeywa Hydropower Project
This Environmental and Social Impact Assessment Report (ESIA) is prepared by a combined team of international and national experts on behalf of SN Power, for the Middle Yeywa Hy...
-
[Draft] Preliminary Environmental Impact Assessment: Exploration and Exploitation Project of Ilmenite
Samnang Re Tbong Thmor Import Export and Development Co., Ltd. conducted a preliminary environmental impact assessment under the exploration and exploitation project of ilmenite...
-
[Draft] Initial environmental and social impact assessment : Kamchay hydroelectric project in Kampot province
The Shinohydro is one of the leading company to utilize the water for producing electricity that has 10 subsidiaries and 70 network companies. The company won the international ...