Skip to content

Additional Information

Field Value
Last updated 4 ຕຸລາ 2021
Created 10 ເມສາ 2019
ຮູບແບບເອກະສານ PDF
ການອະນຸຍາດ unspecified
ຊື່ Table of content
ພາສາຂອງແຫຼ່ງຂໍ້ມູນ
  • ອັງກິດ
ລາຍລະອຽດ

The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level and about 40m above the river. There are 5 turbine units with a capacity of 80MW each.