-
TTCL Power Myanmar Company Limited (TPMC)_ESIA for LNG Power Plant (Ahlone) in Yangon
This Environmental and Social Impact Assessment (ESIA) will only cover the LNG Receiving Terminal, Pipeline, and Power Plant; while an Initial Environmental Examination (IEE)...
-
Destination Management Plan for the Inlay Lake Region 2014 - 2019
The Destination Management Plan (DMP) for the Inlay Lake Region is the result of extesive stakeholder consultations, interviews, focus group discussions, workshops and expert...
-
ກົດໝາຍວ່າດ້ວຍແຮ່ທາດ (ສະບັບປັບປຸງໃໝ່ປີ 2017)
ດຳລັດສະບັບນີ້ແບ່ງອອກເປັນ 15 ພາກ ແລະ ປະກອບມີ 136 ມາດຕາຊຶ່ງກຳນົດບັນດາ ຫຼັກການ, ລະບຽບການ, ມາດຕະການ ແລະ ການຕິດຕາມ, ກວດກາ, ແລະ ປົກປ້ອງການຄ້າ ແລະ ທຸກໆປະເພດທຸລະກິດທີ່ກ່ຽວຂ້ອງກັບຊັບພະຍາ...
-
ດຳລັດເລກທີ 21 ວ່າດ້ວຍການປະເມີນຜົນກະທົບຕໍ່ສິ່ງແວດລ້ອມ
ດຳລັດສະບັບນີ້ກຳນົດຫຼັກການ, ລະບຽບການ, ມາດຕະການ ກ່ຽວກັບການຄຸ້ມຄອງ ແລະ ຕິດຕາມ, ກວດກາວຽກງານປະເມີນຜົນກະທົບຕໍ່ສິ່ງແວດລ້ອມ ເພື່ອໃຫ້ວຽກງານດັ່ງກ່າວດຳເນີນຢ່າງຖືກຕ້ອງ, ໂປ່ງໃສ ແລະ ເອກະພາບ ເ...
-
ທົບທວນຄືນຜົນກະທົບຂອງເຂື່ອນໄຟຟ້າພະລັງນໍ້າໃນອ່າງແມ່ນໍ້າຂອງ
ເອກະສານສະບັບນີ້ຄົ້ນຄວ້າກ່ຽວກັບຜົນກະທົບທາງສັງຄົມ ແລະ ສິ່ງແວດລ້ອມຂອງເຂື່ອນໄຟຟ້າພະລັງງານນ້ ຳໃນແມ່ນໍ້າຂອງຫລາຍແຫ່ງ ແລະ ການຈັດກຸ່ມເຂື່ອນ ແລະ ພູມສັນຖານຂອງຜົນກະທົບຂອງມັນ; ການກວດກາລະບົບແ...
-
National Protected Areas of Vietnam
Dataset is polygon data with geospatial referecing. The World Database on Protected Areas (WDPA) is the most comprehensive global spatial dataset on marine and terrestrial...
-
Resilient Shores : Vietnam’s Coastal Development Between Opportunity and Disaster Risk
In a country that is among the most exposed to natural hazards, Vietnam’s coastline often bears the brunt. Typhoons, storm surges, riverine flooding, coastal erosion, droughts,...
-
Draft Environment and Natural Resources Code: 11th Draft
The purpose of this Environment and Natural Resources Code is to enable the sustainable development of the Kingdom of Cambodia, by protecting the environment and conserving,...
-
Draft Environment and Natural Resources Code: 10th Draft
The purpose of this Environment and Natural Resources Code is to enable the sustainable development of the Kingdom of Cambodia, by protecting the environment and conserving,...
-
June Cement Industry Ltd._Initial Environmental Examination for Clay Soil Production Project in Kyaikmaraw Township
This IEE report is prepared by 3rd party, E Guard Environmental Services Co., Ltd. for June Cement Industry Ltd. for the project of Clay Soil Production located at Near Kaw Pa...
-
Myanmar Conch Cement Co., Ltd._Environmental Impact Assessment for Thandawmyat Limestone Quarry in Kyaukse Industrial Zone
This ESIA report is prepared for the proposed Limestone Quarry at Thandawmyat area, Kyaukse Township, Mandalay Region. The project proponent is Myanmar Conch Cement Co., Ltd....
-
Hoya International Resort Co., Ltd._Initial Environmental Examination for International Hotel Project
This IEE is prepared for the international hotel project of Hoya International Resort Co., Ltd. and the project is location is No.218, Yangon-Insein Road, Hlaing Township,...
-
DELCO Ltd._Environmental Management Plan for existing Kanbauk Mine Project
This EMP is prepared for the existing operational mining activities within the Kanbauk Tin and Tungsten Mine Project which is located in Kanbauk Township, Dawei District,...
-
June Cement Industry Ltd._Initial Environmental Examination for Construction of Jetty in Kyaikmaraw Township
June Cement Industry Limited proposed to conduct the Initial Environmental Examination (IEE) report for proposed jetty construction, at near Kaw Pa Naw Village, Kyaikmaraw...
-
Good Shan Brother International Co., Ltd._Initial Environmental Examination for Saytan Island Report
This IEE report is prepared for the development of an island resort in the Saytan Islands which is located 33 nautical miles southwest of the mainland from Kawthoung Township,...
-
A1 Mining Co., Ltd._Revised EIA Report for Medium-scale Mining of Tin and Tungsten in Tanintharyi Region
This EIA is prepared for medium-scale mining of tin and tungsten in Kyein Chaung Village, Nyaung Pin Kwin Village Tract, Tanintharyi Township, Tanintharyi Region. The total area...
-
Century Bright Gold Co., Ltd._Initial Environmental Examination for Bo Wei Island Resort
This Initial Environmental Examination is prepared for the island resort in the Bo Wei Islands located to the notrth-west of Kawthong District, Tanintharyi Region, Myanmar. The...
-
Ruby Dragon Mining Co., Ltd._Environmental Compliance Certificate (ECC)
The objectives of this ECC are to: 1. prevent, minimize, and/or offset adverse environmental and social impacts; 2. confirm the Project commitments and obligations of the...
-
Know The Truth Group Co., Ltd._Environmental Management Plan for Central Hotel at Ngwe Saung Beach
The proposed hotel project is located at the Ngwe Saung Beach, Pathein Township, Ayeyarwady Region, The land area is 45.98 acres. The project proponent, Know The Truth Group...
-
June Cement Industry Ltd._Initial Environmental Examination for Construction of Canal in Kyaikmaraw Township
This report has been prepared by third party; E Guard Environmental Services Co., Ltd. for June Cement Industry Ltd. for the project of Construction of Canal (Channel 1) of June...