Skip to content

Additional Information

Field Value
Last updated 3 ສິງຫາ 2021
Created 3 ສິງຫາ 2021
ຮູບແບບເອກະສານ PDF
ການອະນຸຍາດ Creative Commons Attribution Share-Alike
ຊື່ Webpage capture on hydropower dam of Cambodian Tatay Hydropower Limited
ລາຍລະອຽດ

The reservoir capacity of Tatai hydroelectric project is 404X106 cubic meters and the surface area is 1330 hectares, and the unworked reservoir capacity is 82x106 cubic meters. The project will renovate Thmor Bang road from the intersection of National Road No. 48 to the entry gate, which is 5,3 kilometers. Constructing a road to the dam site with a length of 9,45 kilometers.

ພາສາຂອງແຫຼ່ງຂໍ້ມູນ
  • ອັງກິດ
  • ຂະແມ