ຊື່ Webpage capture on Steung Trong-Kroch Chhmar bridge to complete as planned in 2021
ລາຍລະອຽດ

The third bridge across the Mekong River, Stung Trang-Kroch Chhmar, with a total length of 1,131 meters and a width of 13.50 meters, is a type of steel-fiber concrete bridge and opened construction on February 9, 2018 with a total budget of more than 56 million dollars and take 42 months to build.