Summary of the environmental and social management plan for Batch 2 rural road construction, Lot 1, Kampong Chhnang province
This document summarizes the environmental and social management measures for the rehabilitation and reconstruction of the 12.33-kilometre rural road from Kouk Banteay to Kang Taov in Rolea B'ier district, Kampong Chhnang province, under Batch 2, Lot 1 of the National Restoration of Rural Productive Capacity Project. It describes the road construction works, including drainage structures, potential environmental and social impacts, affected households and roadside assets, and the outcomes of public consultations. It also outlines the grievance mechanism and arrangements for managing environmental, social, health, and occupational safety risks during construction.
ข้อมูลเพิ่มเติม
| ฟิลด์ | ค่า |
|---|---|
| ปรับปรุงครั้งล่าสุด | 15 พฤศจิกายน ค.ศ. 2026 |
| สร้างแล้ว | ไม่ทราบ |
| รูปแบบ | |
| ใบอนุญาต | License not specified |
| ชื่อ | Summary of the environmental and social management plan for Batch 2 rural road construction, Lot 1, Kampong Chhnang province |
| คำอธิบาย |
This document summarizes the environmental and social management measures for the rehabilitation and reconstruction of the 12.33-kilometre rural road from Kouk Banteay to Kang Taov in Rolea B'ier district, Kampong Chhnang province, under Batch 2, Lot 1 of the National Restoration of Rural Productive Capacity Project. It describes the road construction works, including drainage structures, potential environmental and social impacts, affected households and roadside assets, and the outcomes of public consultations. It also outlines the grievance mechanism and arrangements for managing environmental, social, health, and occupational safety risks during construction. |
| ภาษาของเอกสาร |
|