-
Webpage capture on hydropower dam of Cambodian Tatay Hydropower Limited
The reservoir capacity of Tatai hydroelectric project is 404X106 cubic meters and the surface area is 1330 hectares, and the unworked reservoir capacity is 82x106 cubic meters. The project will renovate Thmor Bang road from the intersection of National Road No. 48 to the entry gate, which is 5,3 kilometers. Constructing a road to the dam site with a length of 9,45 kilometers.
ข้อมูลเพิ่มเติม
ฟิลด์ | ค่า |
---|---|
ปรับปรุงครั้งล่าสุด | 3 สิงหาคม ค.ศ. 2021 |
สร้างแล้ว | ไม่ทราบ |
รูปแบบ | |
ใบอนุญาต | Creative Commons Attribution Share-Alike |
ชื่อ | Webpage capture on hydropower dam of Cambodian Tatay Hydropower Limited |
คำอธิบาย |
The reservoir capacity of Tatai hydroelectric project is 404X106 cubic meters and the surface area is 1330 hectares, and the unworked reservoir capacity is 82x106 cubic meters. The project will renovate Thmor Bang road from the intersection of National Road No. 48 to the entry gate, which is 5,3 kilometers. Constructing a road to the dam site with a length of 9,45 kilometers. |
ภาษาของเอกสาร |
|