-
Webpage capture on the news article of Samdech Techo Hun Sen inaugurated the opening of a cement factory in Battambang province.
This webpage capture talks about the Battambang Conch Cement factory is built on a site with a total area of 316 hectares and took 18 months to build since the end of 2016. The construction of the factory used an investment capital of approximately US$230 million, which is a joint investment between Conch International Holding (HK) Limited and Battambang KT Cement Co.,Ltd, represented by Oknha Si Kong Triv and Oknha Vinh Hour.
ข้อมูลเพิ่มเติม
| ฟิลด์ | ค่า |
|---|---|
| ปรับปรุงครั้งล่าสุด | 15 มกราคม ค.ศ. 2025 |
| สร้างแล้ว | ไม่ทราบ |
| รูปแบบ | |
| ใบอนุญาต | License not specified |
| ชื่อ | Webpage capture on the news article of Samdech Techo Hun Sen inaugurated the opening of a cement factory in Battambang province. |
| คำอธิบาย |
This webpage capture talks about the Battambang Conch Cement factory is built on a site with a total area of 316 hectares and took 18 months to build since the end of 2016. The construction of the factory used an investment capital of approximately US$230 million, which is a joint investment between Conch International Holding (HK) Limited and Battambang KT Cement Co.,Ltd, represented by Oknha Si Kong Triv and Oknha Vinh Hour. |
| ภาษาของเอกสาร |
|