Chapter 8: Conclusion and recommendation
China Southern Power Grid Co., Ltd. develop hydro-power in Koh Kong. The study group from China chose two studies to study the feasibility of hydroelectric projects. According to the study, the hydroelectric power plant is capable of producing 108 MW of electricity and will require 4.5 years. The total investment cost is about USD 327 million.
Thông tin khác
Miền | Giá trị |
---|---|
Cập nhật lần cuối | 30 tháng 9, 2021 |
Được tạo ra | Không biết |
Định dạng | |
Giấy phép | unspecified |
Tên | Chapter 8: Conclusion and recommendation |
Các ngôn ngữ của tài nguyên |
|
Mô tả | China Southern Power Grid Co., Ltd. develop hydro-power in Koh Kong. The study group from China chose two studies to study the feasibility of hydroelectric projects. According to the study, the hydroelectric power plant is capable of producing 108 MW of electricity and will require 4.5 years. The total investment cost is about USD 327 million. |