Wuxi Hua Guang (Myanmar) Co., Ltd._Environmental and Social Impact Assessment for Tigyit Coal Fired Power Plant

As per EIA Procedures (2015), this ESIA report for Tigyit coal-fired power plant (120 MW) to identify and evaluate the potential impacts from the operation of the power plant. The project is an existing one and located in Tigyit Village Tract, Pinlaung Township, Pa Oh Self-Administration Region, Southern Shan State. The project proponent, Wuxi Hua Guang (Myanmar) Co., Ltd., is a sole subsidiary of the former famous boiler manufacturer, Wuxi Hua Guang Boiler Co., Ltd. in Shanghai, China. The total land area of power plant is 45.05 hectares.

Data Resources (2)

Data Resource Preview - ESIA of Tigyit Coal Fired Power Plant_pg 1 to 411

Additional Info

Field Value
Geographic area (spatial range)
  • Myanmar
Topics
  • Environmental impact assessments
  • Non-renewable energy production
Document type Environmental Impact Assessment
Contracting Parties
  • Wuxi Hua Guang (Myanmar) Ltd.
Government Entity (multiple)
  • Ministry of Natural Resources and Environmental Conservation
Disclosure Mode Released by government
License

No license given

Copyright No
Access and use constraints

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

Version / Edition 1
Language of document
  • English
  • Burmese
Province(s)
  • Shan
Links to source https://www.mediafire.com/folder/s6k89sv3ybfi2/Environmental_Impact_Assessment_(EIA)_Report_for_Thi_gyit_(Tigyit)_Coal-fired_Power_Plant, http://www.ecd.gov.mm/?q=policy
Party's obligation in the implementation of the project

Wu Xi Hua Guan Co., Ltd. has the obligation to ensure that the people and the natural environment are adequately protected from the negative impacts generated from the project and they adequately and rightfully benefit from the positive impact.

Environmental fund summary

The company will reserve USD 74,000 annual for Environmental Monitoring Plan in the operation phase.