Skip to content

Prakas no. 0130 on determination of the rooftop solar power quota size in Cambodia for 2025

This Prakas determines the size of the rooftop solar power system quota for implementation in 2025, allowing the Electricity Authority of Cambodia (EAC) to issue permits to electricity users who apply to install and use rooftop solar power systems in 2025.

Data Resources (1)

Data Resource Preview - Prakas no. 0130 on determination of the rooftop solar power quota size in Cambodia for 2025

Additional Info

Field Value
Geographic area (spatial range)
  • Cambodia
Document reference # 0130
Issuing agency/parties
  • Ministry of Mines and Energy
Language
  • Khmer
Formal type of document Proclamation
Topics
  • Electricity infrastructure
  • Electricity policy and administration
  • Renewable energy production
License

No license given

Copyright No
Access and use constraints

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form, and content for any loss, harm or damage suffered as a result of its use.

Status Signed and in effect
Adoption date/Enacted/Promulgation date/Signing date May 22, 2025
Effective/Enforced Date May 22, 2025
Publication reference Electricity Authority of Cambodia (EAC)
Links to source https://eac.gov.kh/site/viewfile?param=legal_doc%2Fkhmer%2Fprakas%2Fprakas_system_settings_and_quota+sizes_year_2025.pdf
Contact

Electricity Authority of Cambodia (EAC)

Address: Building 762, West Railway Station Boulevard (Street 113), Village I, Sangkat Sras Chork, Khan Daun Penh, Phnom Penh Telephone: (855)-23-217 264 (855)-23-987 898 Fax: (855)-23-214 144

Legacy reference document Prakas_no. 0130__22.05.2025.pdf
Keywords Solar,rooftop solar power systems
Date uploaded November 29, 2025, 20:18 (UTC)
Date modified November 29, 2025, 20:23 (UTC)