Skip to content

Hydropower sector review for the Joint Basin planning process

The Basin Development Plan Phase 2 (BDP2) is designed to provide an integrated basin perspective through the participatory development of a rolling Integrated Water Resources Management (IWRM) based Basin Development Plan. The preparation of the Plan will bring all existing, planned and potential water and related resources development projects in a joint basin planning process, through a combination of sub-basin and sector activities,and a basin-wide integrated assessment framework. This offers an integrative platform for the Mekong River Commission (MRC)to engage in transboundary assessment and multi-stakeholder consultation to facilitate a broad and informed dialogue on sustainable water resources development and management.

Data Resources (2)

Data Resource Preview - Hydropower sector review for the Joint Basin planning process

Additional Info

Field Value
Document type Reports, journal articles, and research papers (including theses and dissertations)
Language of document
  • English
Topics
  • Hydropower dams
  • Rivers and lakes
Geographic area (spatial range)
  • Cambodia
  • Lao People's Democratic Republic
  • Thailand
  • Viet Nam
Copyright Yes
Access and use constraints

All information posted on the MRC website www.mrcmekong.org is publicly available and may be used for non-profit activities, namely research, provided the MRC is properly accredited. Prior permission need not be sought.

Version / Edition 1
License unspecified
Contact

Mekong River Commision P.O Box 6101, Vientiane, Lao PDR Tel: (856) 21 263 263 Fax: (856) 21 263 264 Email: mrce@mrcmekong.org

Author (individual) Mekong River Commission
Publication place Laos
Publisher Mekong River Commission
Publication date 2009
Pagination 44
Keywords Mekong River,integrated water resources management,Lower Mekong Basin
Date uploaded November 21, 2017, 09:43 (UTC)
Date modified June 18, 2018, 05:05 (UTC)