[Draft] Environmental Impact Assessment: Cambodia Block A Development
ຈັດພິມໂດຍ: Open Development Cambodia
ແຫຼ່ງຂໍ້ມູນ (6)
ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - Environmental Impact Assessment: Cambodia Block A Development (Part 1)
Additional Info
Field | Value |
---|---|
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດທີ່ຕັ້ງ) |
|
ຫົວຂໍ້ |
|
ປະເພດເອກະສານ | Environmental Impact Assessment |
ຄູ່ສັນຍາ |
|
ໜ່ວຍງານລັດຖະບານ (ຫຼາຍພາກສ່ວນ) |
|
ຮູບແບບການເປີດເຜີຍຂໍ້ມູນ | ປ່ອຍໂດຍອົງການທ້ອງຖິ່ນທີ່ບໍ່ແມ່ນລັດຖະບານ |
ສັນຍາລິຂະສິດ | CC-BY-SA-4.0 |
ລິຂະສິດ | To be determined |
ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້ |
By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use. |
ສະບັບທີ / ຄັ້ງທີ | 1 |
ພາສາຂອງເອກະສານ |
|
ແຂວງ |
|
ຂໍ້ມູນອ້າງອີງຂອງ Metadata |
Metadata last updated on 2018-05-03. For inquiries contact: Open Development Cambodia, Email: contact@opendevcam.net, Website: http://www.opendevcam.net Address: 43 St. 208, Phnom Penh, Cambodia. |
ຂໍ້ມູນຕິດຕໍ່ |
International Environmental Management Co. Ldt. (IEM) Address: Bangkok (Head Office) 8th Floor, Sitthivorakit Building, 5 Soi Pipat, Silom Road, Bangrak, Bangkok 10500, Thailand. Tel: (66-2) 636.6390-9, 636.6683-4, Fax: (66-2) 236-6276, E-mail: ron@iem-global.com |
ເນື້ອທີ່ອະນຸມັດ | 470900.0 |
ແຜນການນຳໃຊ້ທີ່ດິນ | Year 0, Platform A Installation, Drilling and Hook up and commissioning service (HUC); Year 3, Installation, Drilling and HUC B; Year 4, Installation, Drilling and HUC C; Year 4, Installation, Drilling and HUC D; Year 5, Installation, Drilling and HUC E; Year 5, Installation, Drilling and HUC F; Year 6, Installation, Drilling and HUC G; Year 7, Installation, Drilling and HUC H; Year 8, Installation, Drilling and HUC I; Year 9, Installation, Drilling and HUC J3 |
ຫົວໜ່ວຍແຜນການນຳໃຊ້ທີ່ດິນ | Ha |
ສະຫຼຸບການສ້າງວຽກເຮັດງານທຳ |
Core operations require 50 people during phase 1 a. Approximately 30 people total will be needed to run the ship and 20 people total to run the facilities. Additional personnel may be required for Phase 1 c. Where appropriate, the use of local business firms and employees will be a priority for Chevron and partners. |
ຈຳນວນວຽກທີ່ສ້າງ | 50.0 |
ພັນທະໃນການປົກປັກຮັກສາສິ່ງແວດລ້ອມ |
Environmental monitoring measures will be taken to verify the effectiveness of mitigation measure on various aspects such as seawater and sediment, fishing, tourism, air quality, rare and endangered species, greenhouse gas emission, under water noise, drill cutting and mud, waste generation, and benthos. |
ໂຄງການທີ່ກ່ຽວຂ້ອງ |
Oil and Gas Block A: https://opendevelopmentcambodia.net/en/profiles/oil-and-gas-blocks/?feature_id=27 |
ເອກະສານອ້າງອີງສະເພາະ | Draft_EIA_report_Cheveron__00.03.2012.pdf |
ເລກທີສັນຍາແບບເປີດ | ocds-miumsd-b77e2ed5-64c3-4fd9-a706-76c8a82792ba |
ວັນທີອັບໂຫຼດ | ພະຈິກ 1, 2018, 02:35 (UTC) |
ວັນທີດັດແປງ | ກັນຍາ 27, 2021, 04:34 (UTC) |