As per EIA Procedures (2015), this ESIA report for Tigyit coal-fired power plant (120 MW) to identify and evaluate the potential impacts from the operation of the power plant. The project is an existing one and located in Tigyit Village Tract, Pinlaung Township, Pa Oh Self-Administration Region, Southern Shan State. The project proponent, Wuxi Hua Guang (Myanmar) Co., Ltd., is a sole subsidiary of the former famous boiler manufacturer, Wuxi Hua Guang Boiler Co., Ltd. in Shanghai, China. The total land area of power plant is 45.05 hectares.

ແຫຼ່ງຂໍ້ມູນ (2)

ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - ESIA of Tigyit Coal Fired Power Plant_pg 1 to 411

Additional Info

Field Value
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດທີ່ຕັ້ງ)
  • ມຽນມາ
ຫົວຂໍ້
  • Environmental impact assessments
  • Non-renewable energy production
ປະເພດເອກະສານ Environmental Impact Assessment
ຄູ່ສັນຍາ
  • Wuxi Hua Guang (Myanmar) Ltd.
ໜ່ວຍງານລັດຖະບານ (ຫຼາຍພາກສ່ວນ)
  • ກະຊວງຊັບພະຍາກອນທຳມະຊາດ ແລະ ອະນຸລັກສິ່ງແວດລ້ອມ
ຮູບແບບການເປີດເຜີຍຂໍ້ມູນ ປ່ອຍໂດຍລັດຖະບານ
ສັນຍາລິຂະສິດ

No license given

ລິຂະສິດ No
ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ສະບັບທີ / ຄັ້ງທີ 1
ພາສາຂອງເອກະສານ
  • ອັງກິດ
  • ມຽນມາ
ແຂວງ
  • ຊານ
ລີ້ງເພື່ອໄປຫາແຫຼ່ງຂໍ້ມູນ https://www.mediafire.com/folder/s6k89sv3ybfi2/Environmental_Impact_Assessment_(EIA)_Report_for_Thi_gyit_(Tigyit)_Coal-fired_Power_Plant, http://www.ecd.gov.mm/?q=policy
ພັນທະຂອງຄູ່ສັນຍາໃນການຈັດຕັ້ງປະຕິບັດໂຄງການ

Wu Xi Hua Guan Co., Ltd. has the obligation to ensure that the people and the natural environment are adequately protected from the negative impacts generated from the project and they adequately and rightfully benefit from the positive impact.

ສະຫຼຸບກ່ຽວກັບກອງທຶນສິ່ງແວດລ້ອມ

The company will reserve USD 74,000 annual for Environmental Monitoring Plan in the operation phase.