  • Law on the Establishment of the Ministry of Industry, Mines and Energy

    This Law states about the establishment of the Ministry of Industry, Mines and Energy that signed in 1995.

  • Final Report on Preparatory Survey for Phnom Penh Transmission Line and Distribution System Construction Project

    The Final Report on Preparatory Survey for Phnom Penh Transmission Line and Distribution System Construction Project, written by Electricité du Cambodge (EDC), aims to improve...

  • Progress of Cambodia power development plans and transmission interconnection projects

    The presentation slides were prepared for the 8th Meeting of the Focal Group (FG-8) of the Greater Mekong Sub-region (GMS), on 26 November 2009, at Luangprabang of the Lao...

  • Cambodia Energy Status and Its Development

    The presentation was prepared by EDC for the 2011 Cambodia outlook conference of CDRI and ANZ Royal Bank on 16 March 2011, at Phnom Penh Hotel. The current development of...

  • Sub-Decree no. 254 on management and improvement of energy efficiency of electrical appliances

    This sub-decree sets out the regulations for the management and improvement of energy efficiency of electricity appliances in the Kingdom of Cambodia through the implementation...

  • Webpage capture on SOLAR LONG PV-Tech (Cambodia) Co., Ltd. company profile

    Webpage capture on SOLAR LONG PV-Tech (Cambodia) Co., Ltd. company profile indicates the content and more information on its company.

  • Solar power plant in Cambodia

    ບໍ່ມີຄຳອະທິບາຍສຳລັບຊຸດຂໍ້ມູນນີ້


  • Hydropower plants in Vietnam by October 2020

    ບໍ່ມີຄຳອະທິບາຍສຳລັບຊຸດຂໍ້ມູນນີ້


  • ເຂື່ອນໄຟຟ້ານ້ຳຕົກໃນພາກພື້ນລຸ່ມແມ່ນ້ຳຂອງປີ 2016

    ຊຸດຂໍ້ມູນນີ້ປະກອບດ້ວຍການພັດທະນາໄຟຟ້ານໍ້າຕົກອັນເປັນທີ່ຮູ້ຈັກໃນທົ່ວເຂດອະນຸພາກພື້ນແມ່ນໍ້າຂອງ ເຖິງແມ່ນວ່າບໍ່ແມ່ນຊຸດຂໍ້ມູນຄົບຖ້ວນ. ມັນລວມມີຂໍ້ມູນຕົ້ນສະບັບທີ່ເກັບກຳໂດຍ Open Developmen...

  • Presentation on small hydropower for developing countries: Cambodia

    This brief presentation introduces with the objectives of energy policy, which has established since October 1994, followed by a list of maps of potential macro and micro...

  • Webpage capture on listed Chinese firm licensed to build another solar park

    Webpage capture on listed Chinese firm licensed to build another solar park reports on detailed information of a business license to Chinese panel maker Risen Energy (Cambodia).

  • Webpage capture on Botum Sakor power station

    Webpage capture on Botum Sakor power station depicts principle parameters of project location, background on the plant, land compensation, financing, coal source, threats to the...

  • Webpage capture on the news article of Royal Group to do study on 700MW power plant

    Webpage capture on the article of Royal Group to do study on 700MW power plant briefs on the feasibility study on a 700-megawatt coal-fired power plant in Preah Sihanouk...

  • Webpage capture on the company profile of Cetic International Hydropower Development Company Ltd.

    Webpage capture on the company profile page of Cetic International Hydropower Development Co., Ltd. shows detailed information of company name, status, incorporation date,...

  • Webpage capture on the article of Chinese-built power plant begins operation in Cambodia

    Webpage capture on the article of "Chinese-built power plant begins operation in Cambodia" takes a brief on the information of the 120-megawatt Atai hydropower plant and its...

  • Webpage capture on company profile page of Risen Energy

    Webpage capture on the company profile page of Risen Energy shows insights of the company with their overseas and domestic projects.

  • Webpage capture on The Lower Sesan 2 (LS2) dam

    The Lower Sesan 2 (LS2) dam is a hydropower project that began operating in 2017 on the Sesan River in Cambodia, 15 miles upstream from where it meets the Mekong river. The dam...

  • Webpage capture: Sihanoukville CIIDG power station

    Webpage capture on the Sihanoukville CIIDG power station depicts principle parameters of project location, background on the plant, expansion, special economic zone, stabbing...

  • Webpage capture: Construction date yet to be set for $1.3B coal-fired station

    Webpage capture on the article of construction date yet to be set for $1.3B coal-fired station, published on 20 August 2019, has detailed the research and development stage​ of...

  • Webpage capture of 700MW coal plant construction

    The webpage capture of 700MW coal plant construction displays the website and information content conveying to the 700MW coal-fired power plant in Preah Sihanouk province with...