Skip to content

Webpage capture on the news article of Royal Group to do study on 700MW power plant

ຈັດພິມໂດຍ: Open Development Cambodia

Webpage capture on the article of Royal Group to do study on 700MW power plant briefs on the feasibility study on a 700-megawatt coal-fired power plant in Preah Sihanouk province. The article was posted by the Khmer Times on 18 June 2019.

ແຫຼ່ງຂໍ້ມູນ (1)

ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - Webpage capture on the article of Royal Group to do study on 700MW power plant

Additional Info

Field Value
ປະເພດເອກະສານ Archived web content
ພາສາຂອງເອກະສານ
  • ອັງກິດ
ຊື່ຫຍໍ້ (ຊື່ອື່ນທີ່ແຕກຕ່າງຈາກຊື້ຫຼັກ) 700MW power plant
ຫົວຂໍ້
  • Coal
  • Energy
  • Investment
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດພື້ນທີ່)
  • ກຳປູເຈຍ
ແຂວງ
  • ພ໌ເຣອາສີຫະນຸກ
ລິຂະສິດ Yes
ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form, and content for any loss, harm, or damage suffered as a result of its use.

ສະບັບທີ / ຄັ້ງທີ 1
ສັນຍາລິຂະສິດ

No license given

ຂໍ້ມູນຕິດຕໍ່

Khmer Times

Mail address: Lot#1381, National Road 2, Sangkat Chak Angre Krom, Khan Meanchey, Phnom Penh, Kingdom of Cambodia Tel: +855 23 881 591 / 691 Khmer website: https://www.khmertimeskh.com/category/khmer/ English website: https://www.khmertimeskh.com/

ຜູ້ຂຽນ (ບຸກຄົນ) Chea Vannak
ຜູ້ຂຽນ (ອົງການຈັດຕັ້ງ) Khmer Times
ຜູ້ຈັດພິມ Khmer Times
ປີຈັດພິມ 2019
ໝາຍເຫດ

Link to the source: https://www.khmertimeskh.com/50614975/royal-group-to-do-study-on-700-mw-power-plant/ Link to the archived webpage: https://archive.fo/wBCun

ເອກະສານອ້າງອີງສະເພາະ Royal_Group_700MW_power_plant__18.06.2019.pdf
ຄຳສັບຫຼັກ Power Plant,Preah Sihanouk,Royal Group,Coal-fired Power
ວັນທີອັບໂຫຼດ ສິງຫາ 2, 2021, 04:08 (UTC)
ວັນທີດັດແປງ ກຸມພາ 7, 2022, 09:50 (UTC)