Skip to content

Assessment of RBO-level mechanisms for sustainable hydropower development and management

ຈັດພິມໂດຍ: Open Development Mekong

This report documents lessons learnt on transboundary cooperation mechanisms that can support the sustainable development and management of hydropower projects. The lessons are drawn by comparing mechanisms and tools applied in five case studies: the Manantali Dam (Senegal, Mali, and Mauritania), the Itaipu Dam (Paraguay/Brazil), the Columbia River Project (USA/Canada), the Kariba Dam (Zambia/Zimbabwe), and the Kosi Dam (Nepal/India).

ແຫຼ່ງຂໍ້ມູນ (1)

ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - Assessment of RBO-level mechanisms for sustainable hydropower development and management

Additional Info

Field Value
ປະເພດເອກະສານ Reports, journal articles, and research papers (including theses and dissertations)
ພາສາຂອງເອກະສານ
  • ອັງກິດ
ຫົວຂໍ້
  • Energy
  • Irrigation and water management
  • Water resources
  • Water rights
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດພື້ນທີ່)
  • ໄທ
  • ຫວຽດນາມ
  • ກຳປູເຈຍ
  • ສາທາລະນະລັດ ປະຊາທິປະໄຕ ປະຊາຊົນລາວ
  • ມຽນມາ
  • ມາເລເຊຍ
  • ອິນໂດເນເຊຍ
  • ສິງກະໂປ
  • ຟິລິປິນ
  • ບຼູໄນ ດາຣູຊາລຳ
  • ເກາະຄຼິສ໌ມາສ໌
  • ຕີມໍ ເລັສ໌ເຕ
  • ໝູ່ເກາະໂກໂກສ໌ (ຄີລິງ)
ສະບັບທີ / ຄັ້ງທີ 1
ສັນຍາລິຂະສິດ unspecified
ຂໍ້ມູນຕິດຕໍ່

Dr. Susanne Schmeier (susanne.schmeier@giz.de)

ຜູ້ຂຽນ (ບຸກຄົນ) Schmeier, Susanne (ed.)
ຜູ້ຂຽນຮ່ວມ (ບຸກຄົນ) Kramer, Annika; Hensengerth, Oliver; Mertens, Anja; Carius, Alexander
ສະຖານທີ່ຈັດພິມ Vientiane, Laos
ຜູ້ຈັດພິມ Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ)
ປີຈັດພິມ 2012
ວັນທີອັບໂຫຼດ ພຶດສະພາ 29, 2015, 04:36 (UTC)
ວັນທີດັດແປງ ມັງກອນ 7, 2016, 21:39 (UTC)