This report has 4 main sections namely project description, evaluation of design and implementation, evaluation of performance and overall assessment and recommendations. This project was estimated to cost $95.0 million, and ADB was to provide a loan for the equivalent $44.3 million from its Special Funds resources to finance 46% of the project cost. At the project completion, the cost cam to $76.0 million, of which ADB financed $38.9 million, or about 51%. The constructions actually commenced in January 2007 and were completed in November 2011.

ແຫຼ່ງຂໍ້ມູນ (1)

ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - Cambodia: Greater Mekong Subregion Transmission Project

Additional Info

Field Value
ປະເພດເອກະສານ Reports, journal articles, and research papers (including theses and dissertations)
ພາສາຂອງເອກະສານ
  • ຂະແມ
ຫົວຂໍ້ Energy
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດພື້ນທີ່)
  • ກຳປູເຈຍ
ລິຂະສິດ Yes
ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ສະບັບທີ / ຄັ້ງທີ 1.0
ສັນຍາລິຂະສິດ CC-BY-SA-4.0
ຂໍ້ມູນຕິດຕໍ່

Cambodia Resident Mission No. 29 Suramarit Blvd. (268/19) Sangkat Chaktomuk, Khan Daun Penh, Phnom Penh, Cambodia

Phone: + 855 23 215 805, 215 806, 216 417 Fax: + 855 23 215 807

ຜູ້ຂຽນ (ອົງການຈັດຕັ້ງ) Asian Development Bank
ຜູ້ຈັດພິມ Asian Development Bank
ປີຈັດພິມ 2012
ເອກະສານອ້າງອີງສະເພາະ ADB_Cambodia_Greater_Mekong_Subregion_Transmission__2012.pdf
ວັນທີອັບໂຫຼດ ມິຖຸນາ 30, 2016, 01:02 (UTC)
ວັນທີດັດແປງ ກໍລະກົດ 15, 2016, 07:54 (UTC)