Skip to content

ESIA: Lower Stung Russei Chrum Hydro-Electric Project in Koh Kong Province

ຈັດພິມໂດຍ: Open Development Cambodia

This document is a part of the report of Environmental and Social Impact Assessment (ESIA) for Lower Stung Russei Chrum Hydro-Electric Project in Koh Kong Province developed by China Huandian Hong Kong Co.,LTD. There are two reservoirs, and GPS coordinates of those reservoirs are listed. The 1st reservoir has a size of 1,481 hectares with the water elevation 263 meters; the 2nd reservoir has a size of 155 hectares with the water elevation 108 meters.

ແຫຼ່ງຂໍ້ມູນ (1)

ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - ESIA: Lower Stung Russei Chrum Hydro-Electric Project in Koh Kong Province

Additional Info

Field Value
ປະເພດເອກະສານ Profiles - Geographical areas and sites
ພາສາຂອງເອກະສານ
  • ຂະແມ
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດພື້ນທີ່)
  • ກຳປູເຈຍ
ລິຂະສິດ Yes
ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ສະບັບທີ / ຄັ້ງທີ 1.0
ສັນຍາລິຂະສິດ CC-BY-SA-4.0
ຜູ້ຂຽນ (ອົງການຈັດຕັ້ງ) SAWAC Consultants for Development
ປີຈັດພິມ 2012
ເອກະສານອ້າງອີງສະເພາະ ESIA__01.01.2012.pdf
ວັນທີອັບໂຫຼດ ກຸມພາ 29, 2016, 03:21 (UTC)
ວັນທີດັດແປງ ກໍລະກົດ 14, 2016, 07:35 (UTC)