transboundary-water-conflicts-a-case-study-yali-hydropower-dam-construction-in-vietnam
A report about the challenges in assessing environmental impacts of large dams along international rivers, using the case study of the Yali dam. The author argues that the construction of the dam showed a failure to conduct a transboundary EIA compliant with international standards because of lacking technical capacity and political will from dam developers, as well as a weakness of the basin coordination unit. The severe negative consequences of the Yali Dam on Cambodian people downstream attracted the attention of the dam developers to re-conduct an EIA even if the construction was already underway. The results of the EIA prove that the dam heavily impacts communities in Cambodia; however, the dam developers in Vietnam offer limited compensation.
ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - Transboundary water conflicts, a case study: Yali hydropower dam construction in Vietnam
Additional Info
Field |
Value |
ປະເພດເອກະສານ |
Reports, journal articles, and research papers (including theses and dissertations) |
ພາສາຂອງເອກະສານ |
|
ຫົວຂໍ້ |
- Environmental and biodiversity protection
- Environmental impact assessments
- Water resources
- Water rights
|
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດພື້ນທີ່) |
- ກຳປູເຈຍ
- ຫວຽດນາມ
- ສາທາລະນະລັດ ປະຊາທິປະໄຕ ປະຊາຊົນລາວ
- ໄທ
|
ລິຂະສິດ |
Unclear copyright |
ສະບັບທີ / ຄັ້ງທີ |
1 |
ສັນຍາລິຂະສິດ |
unspecified
|
ຜູ້ຂຽນ (ບຸກຄົນ) |
Piseth Keo
|
ຈຳນວນໜ້າ |
17 p.
|
ວັນທີອັບໂຫຼດ |
ພຶດສະພາ 29, 2015, 09:08 (UTC)
|
ວັນທີດັດແປງ |
ມິຖຸນາ 23, 2015, 07:37 (UTC)
|