Update to the guidelines for permitting the use of rooftop solar power in Cambodia
ຈັດພິມໂດຍ: Open Development Cambodia
ແຫຼ່ງຂໍ້ມູນ (1)
ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - Update to the guidelines for permitting the use of rooftop solar power in Cambodia
Additional Info
| Field | Value |
|---|---|
| ປະເພດເອກະສານ | Guidelines, instruction manuals, handbooks |
| ພາສາຂອງເອກະສານ |
|
| ຫົວຂໍ້ |
|
| ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດພື້ນທີ່) |
|
| ລິຂະສິດ | No |
| ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້ |
By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form, and content for any loss, harm or damage suffered as a result of its use. |
| ສະບັບທີ / ຄັ້ງທີ | Updated |
| ສັນຍາລິຂະສິດ |
No license given |
| ຂໍ້ມູນຕິດຕໍ່ |
Electricity Authority of Cambodia (EAC) Address: Building 762, West Railway Station Boulevard (Street 113), Village I, Sangkat Sras Chork, Khan Daun Penh, Phnom Penh Telephone: (855)-23-217 264 (855)-23-987 898 Fax: (855)-23-214 144 |
| ຜູ້ຈັດພິມ | Electricity Authority of Cambodia (EAC) |
| ປີຈັດພິມ | 2024 |
| ຈຳນວນໜ້າ | 27 |
| ໝາຍເຫດ |
Link to original source: https://eac.gov.kh/site/viewfile?param=legal_doc%2Fkhmer%2Fprakas%2Fprakas_rooftop_solar_cambodia_updated.pdf |
| ເອກະສານອ້າງອີງສະເພາະ | Update_Guidelines_on_permitting_the_use_of_rooftop_solar_power__18.11.2024.pdf |
| ຄຳສັບຫຼັກ | Rooftop Solar Power |
| ວັນທີອັບໂຫຼດ | ພະຈິກ 30, 2025, 08:55 (UTC) |
| ວັນທີດັດແປງ | ພະຈິກ 30, 2025, 09:04 (UTC) |