Skip to content

Webpage capture on the news article of​ the Bridge project tops out ahead of schedule

ຈັດພິມໂດຍ: Open Development Cambodia

The successful topping out of The Bridge project, which involves the structure of the building reaching the highest point, was achieved on December 18, 2016, and was formally celebrated at a ceremony yesterday afternoon.

ແຫຼ່ງຂໍ້ມູນ (1)

ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - Webpage capture on The Bridge Cambodia

Additional Info

Field Value
ປະເພດເອກະສານ Archived web content
ພາສາຂອງເອກະສານ
  • ອັງກິດ
ຫົວຂໍ້
  • Foreign investors
  • Investment
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດພື້ນທີ່)
  • ກຳປູເຈຍ
ແຂວງ
  • ພະນົມເປັນ
ລິຂະສິດ Yes
ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ສະບັບທີ / ຄັ້ງທີ 1
ສັນຍາລິຂະສິດ

No license given

ຂໍ້ມູນຕິດຕໍ່

Phnom Penh Post

Mail address: The Elements Condominium, Level 7, Hun Sen Boulevard, Phum Tuol Roka III, Sangkat Chak Angre Krom, Khan Meanchey, 12353 Phnom Penh, Cambodia Tel: +855(0) 23 888 161 / 162 Fax: +855(0) 23 214 318 Khmer website: https://www.postkhmer.com/ English website: https://www.phnompenhpost.com/

ສະຖານທີ່ຈັດພິມ Phnom Penh Post
ປີຈັດພິມ 2017
ໝາຍເຫດ

Link to the archived webpage: https://archive.ph/KUa77

ເອກະສານອ້າງອີງສະເພາະ The_Bridge_Cambodia__11.01.2017.pdf
ຄຳສັບຫຼັກ The Bridge Cambodia,Foreign Investment
ວັນທີອັບໂຫຼດ ມີນາ 28, 2022, 03:48 (UTC)
ວັນທີດັດແປງ ພຶດສະພາ 3, 2022, 10:12 (UTC)