[Draft] Environmental and social impact assessment: Stung Atay hydro-electric BOT project in Veal Veng district, Pursat province

C.H.D is one of the largest Chinese companies in the world working on saving and conserving water resources to generate electricity. The company will develop the hydroelectric dam located in O'Som commune, Veal Veng district, 86 kilometers southwest of Koh Kong province, and about 168 kilometers from the company's office at the second dam, southwest from Pursat town.

Data Resources (14)

Data Resource Preview - 1. Table of content

Additional Info

Field Value
ပထဝီဧရိယာ (spatial range)
  • ကမ္ဘောဒီးယား
ခေါင်းစဉ်များ Hydropower dams
စာရွက်စာတမ်းအမျိုးအစား Environmental Impact Assessment
စာချုပ်ချုပ်ဆိုသော အဖွဲ့အစည်းများ
  • Cambodia Hydropower Limited (China)
လုပ်ပိုင်ခွင့်/ ခွင့်ပြုချက် အမည် C.H.D (Cambodia) hydropower development Co.,Ltd.
ထုတ်ဖော်ဖွင့်ပြမှု နည်းလမ်း ကုမ္ပဏီမှထုတ်ပြန်ခြင်း
ခွင့်ပြုချက် Creative Commons Attribution
မူပိုင်ခွင့် No
ရယူခြင်းနှင့် အသုံးပြုခြင်း အကန့်အသတ်များ

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ပြင်ဆင်ချက် 1
စာရွက်စာတမ်း၏ ဘာသာစကား
  • ခမာဘာသာစကား
နယ်ပယ်
  • Pursat
Metadata ကိုရည်ညွှန်းသော သတင်းအချက်အလက်

Metadata last updated on 2019-08-28. For inquiries contact: Open Development Cambodia, Email: contact@opendevcam.net, Website: http://www.opendevcam.net Address: 43 St. 208, Phnom Penh, Cambodia.

ဆက်သွယ်ရန်

SAWAC Consultants for Development

ခွင့်ပြုသော ဧရိယာ 5098.67
စာချုပ်ကာလ 30.0
စာချုပ်ကာလ ယူနစ် နှစ်များ
လုပ်ပိုင်ခွင့်အတွက် ပေးချေစရိတ် ယူနစ် $/ha
မြေအသုံးပြုမှု အစီအမံတွင် သုံးသည့်ယူနစ် Ha
အလုပ်အကိုင်ဖန်တီးပေးနိုင်မှု အကျဉ်းချုပ်

The company plans to recruit staffs and workers. The company gives priority to people living near the project area. During the four-year construction period, there are about 900 people including 500 local residents and 400 Chinese workers. There were 52 workers for the construction of the transmission line from the two power plants to O'Som sub-station, including 4 local residents and 12 Chinese workers. During the 30 years of operation and maintenance, the company recruits 30 people including 19 Cambodian staffs and 11 Chinese staffs and workers. The company plans to recruit 2 Cambodians and 9 Chinese as staffs to manage transmission line from the power tower of Dam 1 to O'Som sub-station. The company plans to recruit 11 people, 2 Cambodian and 9 Chinese as staffs to manage transmission line from power plant of the second dam to O'Som sub-station.

သင်တန်းအကြောင်း အကျဉ်းချုပ်

The project owner will provide training courses for staff and workers, especially Cambodian workers such as technical knowledge, safety precautions, laws, regulations, and prevention strategies for communicable diseases.

ပတ်ဝန်းကျင်ကာကွယ်ရေးဆိုင်ရာ ဝတ္တရား

Overseeing the implementation of the environmental management plan of the company is the responsibility of the coalition of the relevant ministries and departments, which will be developed by the project owner together with the Ministry of Environment. This Environmental Protection and Monitoring Team is under the supervision of the Ministry of Environment.

ပတ်ဝန်းကျင်ဆိုင်ရာရန်ပုံငွေ အကျဉ်းချုပ်

The cost of environmental restoration is USD 3,091,250.00 for 6 months. USD 1,977,248.00 for water and land conservation, USD 35,200.00 for environmental protection, USD 545,200.00 for wildlife protection, USD 40,000.00 for wildlife rehabilitation, USD 66,400.00 for health protection, USD 50,000 in environmental education, USD 100,000.00 in consulting fees and USD 130,000 for construction and relocation costs.

ပတ်ဝန်းကျင်ဆိုင်ရာရန်ပုံငွေ စုစုပေါင်းပမာဏ 3091250.0
ဆက်စပ်သော စီမံကိန်း

Stung Atay I: https://data.opendevelopmentcambodia.net/en/dataset/hydropower-2009-2014/resource/d75af965-ac97-4f9c-8705-f7ead9b7f66d/detail?map_id=72

Stung Atay II: https://data.opendevelopmentcambodia.net/km/dataset/hydropower-2009-2014/resource/d75af965-ac97-4f9c-8705-f7ead9b7f66d/detail?map_id=71

ဆက်ခံရရှိကြောင်းညွှန်းဆိုသည့်စာတမ်း Draft_EIA_CHD_Cambodia_hydropower__00.12.2011.pdf
အဓိကစကားလုံးများ Environmental impact accessment
Open Contracting Identifier ocds-miumsd-96be65c2-66dc-49c0-917b-d0c9831aa7b1
တင်ခဲ့သည့်ရက်စွဲ ဩဂုတ် 28, 2019, 01:40 (UTC)
ပြန်လည်ပြင်ဆင်သည့်ရက်စွဲ အောက်တိုဘာ 4, 2021, 09:44 (UTC)