Skip to content

[Draft] Completed Environmental and Social Impact Assessment (ESIA) on the limestone business project of Kampot Cement Co., Ltd.

The main purpose of the business and use of limestone for processing into cement of Kampot Cement Co., Ltd. is to contribute to the development of sustainable construction and reduce poverty by reducing the cost of cement and increasing revenue. State people, especially those living near and around the project area, by providing employment, reducing migration, and increasing the time and quantity of development in the province, such as roads, bridges, and other constructions.

Data Resources (1)

Data Resource Preview - [Draft] Completed Environmental and Social Impact Assessment (ESIA) on the limestones business project in Kampot province.

Additional Info

Field Value
ပထဝီဧရိယာ (spatial range)
  • ကမ္ဘောဒီးယား
ခေါင်းစဉ်များ
  • Environment and natural resources policy and administration
  • Environmental impact assessments
စာရွက်စာတမ်းအမျိုးအစား Environmental Impact Assessment
စာချုပ်ချုပ်ဆိုသော အဖွဲ့အစည်းများ
  • Kampot Cement Co., Ltd (KCC)
သက်ဆိုင်ရာ အစိုးရ (မျိုးစုံ)
  • Ministry of Environment
လုပ်ပိုင်ခွင့်/ ခွင့်ပြုချက် အမည် Kampot Cement Co., LTD (KCC)
ခွင့်ပြုချက် Creative Commons Attribution Share-Alike
မူပိုင်ခွင့် No
ရယူခြင်းနှင့် အသုံးပြုခြင်း အကန့်အသတ်များ

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any liability against individuals or entities associated with its development, form, and content for any loss, harm, or damage suffered as a result of its use.

ပြင်ဆင်ချက် 1
စာရွက်စာတမ်း၏ ဘာသာစကား
  • ခမာဘာသာစကား
နယ်ပယ်
  • Kampot
Metadata ကိုရည်ညွှန်းသော သတင်းအချက်အလက်

Metadata last updated on 2018-08-03. For inquiries contact: Open Development Cambodia, Address: 23B St. 606, Phnom Penh, Cambodia. Email: contact@opendevcam.net, Website: http://www.opendevcam.net

လက်မှတ်ရေးထိုးသည့်ရက်စွဲ 2017၊ 28 ဒီဇင်ဘာ
ဆက်သွယ်ရန်

SBK Research and Development Co., Ltd.

No.43 St.317 corner 572 Sangkat Beong Kak Ti Pir Khan Tuol Kouk , Phnom Penh

ခွင့်ပြုသော ဧရိယာ 343.75
စာချုပ်ကာလ 5.0
စာချုပ်ကာလ ယူနစ် နှစ်များ
လုပ်ပိုင်ခွင့်အတွက် ပေးချေစရိတ် Year1: 400/year Year 2: 800/year Year 3: 1000/year
လုပ်ပိုင်ခွင့်အတွက် ပေးချေစရိတ် ယူနစ် $/ha
စီမံကိန်းအကောင်အထည်ဖော်ရာ၌ အဖွဲ့အစည်း၏ ဝတ္တရား

Kampot Cement Limestone Mining follows the modern Semi-Open Cut method, cutting from the center of the mountain and from top to bottom over an area of more than 343.75 hectares with a height of 10 meters, which takes 80 years to operate. Silo Oxide (SiO2) Limestone Excavation Site After clearing, site preparation, installation of the production line machinery, construction of the site structure, and access road construction, the company will plan for daily operations for quarrying limestone in 4 main stages, such as drilling & blasting, loading & hauling, crushing, and stocking.

အလုပ်အကိုင်ဖန်တီးပေးနိုင်မှု အကျဉ်းချုပ်

The company will need 212 direct workers for key jobs such as transportation, drilling, infrastructure, rock blasting, pre-mountain patrol, metering, and rock quality inspection.

ဖန်တီးပေးနိုင်သည့် အလုပ်အကိုင်အရေအတွက် 212.0
သင်တန်းအကြောင်း အကျဉ်းချုပ်

All project staff will be trained to understand environmental-social issues and to understand their role under the company's environmental-social management plan. The training will ensure that each employee is well aware of his or her duties in carrying out his / her work with a high regard for environmental and occupational safety issues.

သင်တန်းအတွက် ရန်ပုံငွေ ခွဲဝေခြင်း 1000.0
ပတ်ဝန်းကျင်ကာကွယ်ရေးဆိုင်ရာ ဝတ္တရား

An environmental management plan will be drawn up every six months, outlining data on the amount of solids, liquids, particles, sound, vibration, and control measures and facilities submitted to the Ministry of Environment for review. If necessary, the environmental management plan will be updated or revised to include issues of urgency, randomness, inspection, monitoring, and audit.

လူမှု-ယဉ်ကျေးမှုဆိုင်ရာ ကာကွယ်မှု

The company cooperates with local authorities to educate and guide employees to respect and love each other's cultural and religious traditions, especially the beliefs of local people. The company has measures to reduce the vibration that affects the temple and the artifacts in the temple, as specified in the point of sound and vibration. The company has identified a number of measures to restore and include. As for local life, For example, the company will repair damaged and noisy roads due to project activities. Clean all fluids and liquids from the construction site before closing the project in collaboration with the Provincial Department of Environment and the Provincial Department of Mines and Energy.

လူမှုရေးရန်ပုံငွေ စုစုပေါင်းပမာဏ 2000.0
ပတ်ဝန်းကျင်ဆိုင်ရာရန်ပုံငွေ အကျဉ်းချုပ်

The company has prepared a budget of USD 3,000/year for the first five years. The budget package is divided into two parts. The first phase, USD 1,000/year, is to help improve local environmental standards through education and promotion campaigns on solid waste storage and tree planting. Section 2 supports the headquarters of Meat Say village, roads, pagodas, and caves.

ပတ်ဝန်းကျင်ဆိုင်ရာရန်ပုံငွေ စုစုပေါင်းပမာဏ 1000.0
ဆက်ခံရရှိကြောင်းညွှန်းဆိုသည့်စာတမ်း Draft_ESIA_Kampot_Cement__28.12.2017.pdf
အဓိကစကားလုံးများ limestone construction,Environmental and Social Impact Assessment (ESIA),Kampot Cement
Open Contracting Identifier ocds-miumsd-6f4baa82-05a6-423b-ab48-e503144091dd
တင်ခဲ့သည့်ရက်စွဲ ဩဂုတ် 12, 2024, 03:59 (UTC)
ပြန်လည်ပြင်ဆင်သည့်ရက်စွဲ ဇန်နဝါရီ 30, 2025, 02:09 (UTC)