[Draft] Environmental impact assessment for Lower Sesan 2 hydropower project in Stung Treng province, Cambodia
Published by: Open Development Cambodia
Data Resources (21)
Data Resource Preview - Table of content
Additional Info
Field | Value |
---|---|
ပထဝီဧရိယာ (spatial range) |
|
ခေါင်းစဉ်များ |
|
စာရွက်စာတမ်းအမျိုးအစား | Environmental Impact Assessment |
စာချုပ်ချုပ်ဆိုသော အဖွဲ့အစည်းများ |
|
သက်ဆိုင်ရာ အစိုးရ (မျိုးစုံ) |
|
ခွင့်ပြုချက် |
No license given |
မူပိုင်ခွင့် | Unclear copyright |
ရယူခြင်းနှင့် အသုံးပြုခြင်း အကန့်အသတ်များ |
By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use. |
ပြင်ဆင်ချက် | 1 |
စာရွက်စာတမ်း၏ ဘာသာစကား |
|
နယ်ပယ် |
|
Metadata ကိုရည်ညွှန်းသော သတင်းအချက်အလက် |
Metadata last updated on 06.09.2022. For inquiries contact: Open Development Cambodia Address: #23B, Street 606, Sangkat Boeng Kak Ti Pir, Khan Tuol Kouk Phnom Penh, Cambodia 12152. Email: contact@opendevcam.net Website: http://www.opendevcam.net |
ဆက်သွယ်ရန် |
Key Consultants Cambodia Room no. 684, 6th floor, Building F, Phnom Penh center, Preah Sihanouk Blvd, Khan Chamkarmon, Phnom Penh |
စာချုပ်ကာလ | 100.0 |
စာချုပ်ကာလ ယူနစ် | နှစ်များ |
စီမံကိန်းအကောင်အထည်ဖော်ရာ၌ အဖွဲ့အစည်း၏ ဝတ္တရား |
The project will build a new road to the bypass and bridge project area on the east side of the Sesan River to connect the resettlement area of Srekor village and Khsach Thmey village. The project also builds all community facilities in the resettlement area, including community schools, pagodas, roads, and wells, to a number and standards equivalent to or better than what will be destroyed in the village, which will be flooded. |
အလုပ်အကိုင်ဖန်တီးပေးနိုင်မှု အကျဉ်းချုပ် |
Employment for community workers/people from 2010 to 2014 with a total of approximately 9,500. |
ဖန်တီးပေးနိုင်သည့် အလုပ်အကိုင်အရေအတွက် | 9500.0 |
ပတ်ဝန်းကျင်ကာကွယ်ရေးဆိုင်ရာ ဝတ္တရား |
The mitigation measures that should be taken are: -Reduce the reservoir area as much as possible by reducing the dam height as much as possible -Provide a suitable location for the resettlement area, which is far from the main shelter area -Adequate compensation for the people along the river, who will especially suffer the loss of fish as a result of the plains, based on this annual basis can be made in the sense of livelihood improvement initiatives -Carefully monitor the quantity and quality of water from the dam to ensure that the quantity and quality of water is sufficient for the health of water users below the river to avoid adverse effects and to maintain the ecology of the river and provide compensation measures if Dams cause harm to ecological health as a result of poor quality or quantity of water coming out of the dam. -Ensure that traffic related to the project complies with the road rules and the damage to the road is repaired quickly -Make sure that the dam is built to withstand earthquakes so that it does not collapse in the event of an earthquake -Ensure that construction work begins when demining is complete -Provide remedial measures for tree loss and climate change campaigns by replanting trees according to the type and amount lost. -Collaborate with other dam operators in the catchment area to reduce and manage the overall impact of the dam. |
လူမှု-ယဉ်ကျေးမှုဆိုင်ရာ ကာကွယ်မှု |
Appropriate training course or new skilled and income restoration shall be provided to the local people (boat operators and fishermen). The compensation can be provided in strengthening livelihood program such as new career capacity building, small business fund providing, and agricultural support programs. |
ပတ်ဝန်းကျင်ဆိုင်ရာရန်ပုံငွေ အကျဉ်းချုပ် |
The annual environmental fund is proposed USD 0.5 million, and it will be paid annually to the Ministry of Environment and Forestry Administration of Royal Government of Cambodia to compensate to the forest and wildlife habitat lost by the project. The MoE and FA will use this fund to support forest and wildlife conservation program in the area. This payment is applied to the whole project operation. |
ဆက်စပ်သော စီမံကိန်း |
Lower Sesan II: https://data.opendevelopmentcambodia.net/en/dataset/hydropower-2009-2014/resource/4e6d2d95-80e3-4459-ae09-1b9214746c59/detail?map_id=4 |
ဆက်ခံရရှိကြောင်းညွှန်းဆိုသည့်စာတမ်း | Draft_EIA_Lower_Sesan2_Hydropower__00.10.2008.pdf |
အဓိကစကားလုံးများ | Lower Sesan II,Lower Sesan 2,Hydropower dam,Stung Treng |
Open Contracting Identifier | ocds-miumsd-6ed5a648-a3d4-4dcd-8ba8-cfda3b1ebbeb |
တင်ခဲ့သည့်ရက်စွဲ | စက်တင်ဘာ 7, 2022, 08:17 (UTC) |
ပြန်လည်ပြင်ဆင်သည့်ရက်စွဲ | အောက်တိုဘာ 5, 2022, 07:06 (UTC) |