Skip to content

[Draft] Completed Environmental and Social Impact Assessment on Koh Krabey Resort Development Project of R.P.B Investment Co., Ltd

The specific objectives of the full environmental and social impact assessment study on the Koh Krabey Resort Development Project are: 1. Study the existing biological environmental resources in the region (forest resources, wildlife, fishery resources, corals, and biodiversity). 2. Study the physical environmental resources in the project area (water, soil, and climatic conditions).  3. Study on socio-economic environmental resources near the project area. 4. Study the layout project of leisure houses, ports, and other infrastructure.  5. Analyze the economic and environmental value of the development project. 6. Analyze and evaluate the impacts on natural resources and society caused by from project activities. 7. Determine measures to reduce negative environmental impacts to a minimum level and in line with the project's environmental management plan.

Data Resources (1)

Data Resource Preview - [Draft] Completed Environmental and Social Impact Assessment on Koh Krabey Resort Development Project of R.P.B Investment Co., Ltd

Additional Info

Field Value
ပထဝီဧရိယာ (spatial range)
  • ကမ္ဘောဒီးယား
ခေါင်းစဉ်များ Environmental impact assessments
စာရွက်စာတမ်းအမျိုးအစား Environmental Impact Assessment
စာချုပ်ချုပ်ဆိုသော အဖွဲ့အစည်းများ
  • RPB Investment Co., Ltd
သက်ဆိုင်ရာ အစိုးရ (မျိုးစုံ)
  • Ministry of Environment
လုပ်ပိုင်ခွင့်/ ခွင့်ပြုချက် အမည် Reclassification from public property to state private property in Koh Krabey area, located in Ong Ream village, Prey Nob district, Preah Sihanouk province.
ထုတ်ဖော်ဖွင့်ပြမှု နည်းလမ်း ကုမ္ပဏီမှထုတ်ပြန်ခြင်း
ခွင့်ပြုချက်

No license given

မူပိုင်ခွင့် No
ရယူခြင်းနှင့် အသုံးပြုခြင်း အကန့်အသတ်များ

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any liability against individuals or entities associated with its development, form, and content for any loss, harm, or damage suffered as a result of its use.

ပြင်ဆင်ချက် 1
စာရွက်စာတမ်း၏ ဘာသာစကား
  • ခမာဘာသာစကား
နယ်ပယ်
  • Preah Sihanouk
Metadata ကိုရည်ညွှန်းသော သတင်းအချက်အလက်

Metadata last updated on 2018-08-12. For inquiries contact: Open Development Cambodia, Address: 23B St. 606, Phnom Penh, Cambodia. Email: contact@opendevcam.net, Website: http://www.opendevcam.net

လက်မှတ်ရေးထိုးသည့်ရက်စွဲ 2015၊ 12 နိုဝင်ဘာ
ဆက်သွယ်ရန်

The report is prepared by Creative Green Design Co., Ltd. Address: #322P, St.271Z, Sangkat Terk Tla, Khan Resey Keo, Phnom Penh. Tel: (855-11) 845 695/ 097 204 6789 Email: saphoeuntous09@yahoo.com

ခွင့်ပြုသော ဧရိယာ 10.0
စာချုပ်ကာလ 99.0
စာချုပ်ကာလ ယူနစ် နှစ်များ
မြေအသုံးပြုမှု အစီအမံ 10
မြေအသုံးပြုမှု အစီအမံတွင် သုံးသည့်ယူနစ် Ha
စီမံကိန်းအကောင်အထည်ဖော်ရာ၌ အဖွဲ့အစည်း၏ ဝတ္တရား

The Koh Krabey Resort Development Project is divided into 5 main projects, including - The first area development project for the construction of a natural recreation house with a total area of 7.5 hectares.  - The second area development project includes a restaurant with a bar, a shared swimming pool, a spa/gym, a library/arts venue/performance venue, a flower garden, and a reception area (guest arrival) with a total area of 1 hectare.  - The third zone development project is organized as a tourist port/port for technical equipment/technical facilities, staff accommodation, and police or security headquarters with a total area of 1.5 hectares.  - The fourth zone development project is designed to provide information on ports and car parks with a total area of 1,000 square meters.  - The 5th Zone Development Project will be organized as a reception area for supplies, warehouses, engineering workshops, canoe repair workshops, human resource offices, staff training rooms, accounting offices, parking lots/motorbikes of staff, and fuel storage room for boats with a total area of 500 square meters.

အလုပ်အကိုင်ဖန်တီးပေးနိုင်မှု အကျဉ်းချုပ်
  • In the construction phase of the project: The company needs a total of 600-700 local workers (Khmer) and 30 office workers, of which 15 are foreigners (Russians).
  • In the project execution phase, the company needs a total of 130 local workers (Khmer) and at least 10 foreigners (Russians).
ဖန်တီးပေးနိုင်သည့် အလုပ်အကိုင်အရေအတွက် 130.0
သင်တန်းအကြောင်း အကျဉ်းချုပ်

This training company will pay all the entire cost. The company owner provided the additional courses of training to the employees, including the following: - Training knowledge on techniques for using or controlling all kinds of machinery during the construction and operation of the project.  - Training knowledge on safety protection while working on the project and educating workers to wear health protection equipment while working.  - Training and dissemination of laws and regulations  - Training and education on methods to prevent various epidemics, especially AIDS. - Training and education on how to help protect the environment in and around the project area and knowledge of inspections related to environmental management plans.  - Train workers in solid-liquid management during construction, project implementation, and project completion. - Train staff and workers to love the forest; prohibit deforestation. - Train and educate staff not to cause activities that could affect fisheries and coral reefs around the island. - Training on how to swim and rescue someone is drowned.

ပတ်ဝန်းကျင်ကာကွယ်ရေးဆိုင်ရာ ဝတ္တရား

The Company has taken measures to mitigate a number of environmental impacts such as: forest resources, wildlife, air pollution, noise disturbances, groundwater and groundwater quality, public health and well-being, and the Company has divided it into three phases: pre-project execution, during execution and post-project completion.

လူမှု-ယဉ်ကျေးမှုဆိုင်ရာ ကာကွယ်မှု

The project will provide social and environmental benefits such as:  1) For people to get jobs, trade more than before, and build infrastructure;  2) For the national society, the state receives money from paying taxes, receives money for environmental and social protection, and promotes the domestic tourism sector.

ဘဏ္ဍာရေးတာဝန်များ အကျဉ်းချုပ်
  • For state tax, companies investing in Koh Krabey are required to pay 3% (3%) of gross income annually (from 1 to 15 January next year). 
  • In the case of calculating the rate of gross income less than the calculation of the minimum wage, the company will be required to pay a minimum wage tax of $ 8,400 per year and will increase by $ 1,050 every five years until the end of the contract.
ဘဏ္ဍာရေးတာဝန် စုစုပေါင်းပမာဏ 100000.0
ပတ်ဝန်းကျင်ဆိုင်ရာရန်ပုံငွေ အကျဉ်းချုပ်
  • Environmental Fund from Year 1 to 20 onwards: Participate in tree planting totaling USD 50,000 and conservation of biodiversity totaling USD 50,000.
ပတ်ဝန်းကျင်ဆိုင်ရာရန်ပုံငွေ စုစုပေါင်းပမာဏ 50000.0
ဆက်ခံရရှိကြောင်းညွှန်းဆိုသည့်စာတမ်း Draft_IESIA_R.P.B_Investment__09.10.2015.pdf
အဓိကစကားလုံးများ Koh Krabey Resort Development Project,R.P.B Investment,Koh Krabey,Preah Sihanouk,Creative Green Design,EIA,IESIA,Complete Environmental and Social Impact Assessment,Environmental Impact Assessment
Open Contracting Identifier ocds-miumsd-e673e97d-e029-40eb-b8cf-b1bc5bd368b4
တင်ခဲ့သည့်ရက်စွဲ ဩဂုတ် 12, 2024, 10:24 (UTC)
ပြန်လည်ပြင်ဆင်သည့်ရက်စွဲ ဖေဖော်ဝါရီ 4, 2025, 08:30 (UTC)