Skip to content

[Draft] Initial environmental and social impact assessment (IESIA) on sand mining to create ship route and fill Kampot Special Economic Zone and Port project

The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and International Port.

Data Resources (16)

Data Resource Preview - Table of Content

Additional Info

Field Value
ပထဝီဧရိယာ (spatial range)
  • ကမ္ဘောဒီးယား
ခေါင်းစဉ်များ
  • Environmental impact assessments
  • Mining
  • Special economic zones
စာရွက်စာတမ်းအမျိုးအစား Environmental Impact Assessment
စာချုပ်ချုပ်ဆိုသော အဖွဲ့အစည်းများ
  • Kampot SEZ
သက်ဆိုင်ရာ အစိုးရ (မျိုးစုံ)
  • Ministry of Environment
  • Ministry of Land Management, Urban Planning and Construction
  • Ministry of Mines and Energy
  • Ministry of Water Resources and Meterology
ခွင့်ပြုချက် Creative Commons Attribution Share-Alike
မူပိုင်ခွင့် No
ရယူခြင်းနှင့် အသုံးပြုခြင်း အကန့်အသတ်များ

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ပြင်ဆင်ချက် 1
စာရွက်စာတမ်း၏ ဘာသာစကား
  • ခမာဘာသာစကား
နယ်ပယ်
  • Kampot
Metadata ကိုရည်ညွှန်းသော သတင်းအချက်အလက်

Metadata last updated on 2021-07-07. For inquiries contact: Open Development Cambodia, Email: contact@opendevcam.net, Website: http://www.opendevcam.net Address: 43 St. 208, Phnom Penh, Cambodia.

လက်မှတ်ရေးထိုးသည့်ရက်စွဲ 2010၊ 10 ဧပြီ
ဆက်သွယ်ရန်

CES CO., LTD Address: Phnom Penh, Cambodia. Phone: (855) 12 666 462 Email: info@ces.com.kh

အလုပ်အကိုင်ဖန်တီးပေးနိုင်မှု အကျဉ်းချုပ်

In this project, the company needs about 100 local workers and about 300 foreign workers.

ဖန်တီးပေးနိုင်သည့် အလုပ်အကိုင်အရေအတွက် 400.0
သင်တန်းအကြောင်း အကျဉ်းချုပ်

The company has educational programs for its employees and workers to understand environmental pollution and environmental beauty, such as: - Education on solid and liquid waste management: be careful when spilling or storing oil and pour waste only in designated containers. - Water pollution education: how to use machinery and equipment in a technical manner according to the location and time.

ပတ်ဝန်းကျင်ကာကွယ်ရေးဆိုင်ရာ ဝတ္တရား

The general process of environmental management planning in the project area includes: - Data collection and analysis by the project owner or project consultant - Preparation of monthly, quarterly and annual reports made by the project owner or project consultant - Receipt of reports and implementation of inspections and suggestions for reports by the Ministry or Department of Environment and relevant institutions.

ပတ်ဝန်းကျင်ဆိုင်ရာရန်ပုံငွေ အကျဉ်းချုပ်

The company plans to contribute to environmental resource restoration activities such as replanting mangrove trees in suitable locations, improving the quality of natural seagrass and natural grass planting, restoring coral planting systems in suitable locations, and conserving spawning grounds.

ပတ်ဝန်းကျင်ဆိုင်ရာရန်ပုံငွေ စုစုပေါင်းပမာဏ 3000000.0
ဆက်ခံရရှိကြောင်းညွှန်းဆိုသည့်စာတမ်း Draft_IESIA_Kamport_Port__10.04.2021.pdf
အဓိကစကားလုံးများ International Port,IEIA,Kampot Port,Kampot SEZ
Open Contracting Identifier ocds-miumsd-810cfa5c-314b-4b5c-bbb5-676fed97fe03
တင်ခဲ့သည့်ရက်စွဲ ဇူလိုင် 9, 2021, 06:59 (UTC)
ပြန်လည်ပြင်ဆင်သည့်ရက်စွဲ အောက်တိုဘာ 5, 2022, 08:32 (UTC)