Skip to content

[Draft] Copy of environmental impact assessment report for Lower Sesan 2 hydropower project in Stung Treng province, Cambodia

The main purpose of the Lower Sesan II hydropower project is to meet the medium and long-term energy needs of the Kingdom of Cambodia, as well as to export some energy in excess of demand. The project also responds to the Rectangular Strategy of the Third Mandate Government, which deals with the development of the energy sector to meet the demand for low-cost electricity. Another important purpose is to ensure that energy generation and its positive impact on the nation are carefully weighed against the negative environmental and social impacts it will cause, especially on the upstream area. Downstream and upstream of the project area.

Data Resources (23)

Data Resource Preview - Table of Content

Additional Info

Field Value
ပထဝီဧရိယာ (spatial range)
  • ကမ္ဘောဒီးယား
ခေါင်းစဉ်များ
  • Environmental impact assessments
  • Hydropower dams
စာရွက်စာတမ်းအမျိုးအစား Environmental Impact Assessment
စာချုပ်ချုပ်ဆိုသော အဖွဲ့အစည်းများ
  • Electricity of Vietnam
သက်ဆိုင်ရာ အစိုးရ (မျိုးစုံ)
  • Ministry of Mines and Energy
လုပ်ပိုင်ခွင့်/ ခွင့်ပြုချက် အမည် Lower Sesan II Hydropower Project
ခွင့်ပြုချက်

No license given

မူပိုင်ခွင့် Unclear copyright
ရယူခြင်းနှင့် အသုံးပြုခြင်း အကန့်အသတ်များ

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form, and content for any loss, harm, or damage suffered as a result of its use.

ပြင်ဆင်ချက် 1
စာရွက်စာတမ်း၏ ဘာသာစကား
  • ခမာဘာသာစကား
နယ်ပယ်
  • Stung Treng
Metadata ကိုရည်ညွှန်းသော သတင်းအချက်အလက်

Metadata last updated on 08.09.2022. For inquiries contact: Open Development Cambodia

Address: #23B, Street 606, Sangkat Boeng Kak Ti Pir, Khan Tuol Kouk Phnom Penh, Cambodia 12152. Email: contact@opendevcam.net Website: http://www.opendevcam.net

ဆက်သွယ်ရန်

Vietnam Electricity

Address: Km9+2000, Nguyen Trai, Thanh Xuan, Hanoi, Vietnam Tel: (84) 042148006 Fax: (84) 048541208

စာချုပ်ကာလ 30.0
စီမံကိန်းအကောင်အထည်ဖော်ရာ၌ အဖွဲ့အစည်း၏ ဝတ္တရား

The project will build a new road to the bypass and bridge project area on the east side of the Sesan River to connect the resettlement area of ​​Srekor village and Khsach Thmey village. The project also builds all community facilities in the resettlement area, including community schools, pagodas, roads, and wells, to a number and standards equivalent to or better than what will be destroyed in the village, which will be flooded.

အလုပ်အကိုင်ဖန်တီးပေးနိုင်မှု အကျဉ်းချုပ်

Employment for community workers / people from 2010 to 2014 with a total of approximately 9,500​.

ဖန်တီးပေးနိုင်သည့် အလုပ်အကိုင်အရေအတွက် 9500.0
ပတ်ဝန်းကျင်ကာကွယ်ရေးဆိုင်ရာ ဝတ္တရား

The Environmental Management Plan (EMP) provides a guide for monitoring and mitigation measures for pre-construction, post-construction and project operation. EMPs include institutional summaries, mitigation measures, and monitoring programs. Mitigation measures and monitoring programs will include analysis of responsible institutions and budgets.

လူမှု-ယဉ်ကျေးမှုဆိုင်ရာ ကာကွယ်မှု

Positive impacts on the environment and society include: -Electricity: 400 MW turbine and total power 1953.9 GWh -Rural Infrastructure: The project will build a new road to the bypass and bridge project area on the east side of the Sesan River to connect the resettlement area of ​​Srekor village and Khsach Thmey village. The project also builds all community facilities in the resettlement area, including community schools, pagodas, roads, and wells, to a number and standards equivalent to or better than what will be destroyed in the village, which will be flooded. -Employment: Employment for community workers / people from 2010 to 2014 with a total of approximately 9,500 -Tourism: Natural resources in and around the lake, infrastructure projects and visits to hydropower plants, fishing -Revenue: Selling local products, tourism activities, construction contractors -Economy: Develop Cambodia's infrastructure, including industry / handicraft, agriculture and tourism in the region, paying taxes to the Royal Government of Cambodia through investment law contracts.

ဆက်စပ်သော စီမံကိန်း

Lower Sesan 2៖ https://data.opendevelopmentcambodia.net/km/dataset/hydropower-2009-2014/resource/4e6d2d95-80e3-4459-ae09-1b9214746c59/detail?map_id=

ဆက်ခံရရှိကြောင်းညွှန်းဆိုသည့်စာတမ်း Copy_EIA_Lower_Sesan2_Hydropower__00.09.2009.pdf
အဓိကစကားလုံးများ Lower Sesan2 Hydropower dam,Vietnam Electricity,EIA
Open Contracting Identifier ocds-miumsd-1d1cc12b-4571-47ef-a211-d13e4cde6ac1
တင်ခဲ့သည့်ရက်စွဲ စက်တင်ဘာ 8, 2022, 03:47 (UTC)
ပြန်လည်ပြင်ဆင်သည့်ရက်စွဲ အောက်တိုဘာ 5, 2022, 07:02 (UTC)