-
Chapter 5: Potential environmental impacts and mitigation measures
China Southern Power Grid Co., Ltd. develop hydro-power in Koh Kong. The study group from China chose two studies to study the feasibility of hydroelectric projects. According to the study, the hydroelectric power plant is capable of producing 108 MW of electricity and will require 4.5 years. The total investment cost is about USD 327 million.
Additional Information
Field | Value |
---|---|
Last updated | 2021၊ 30 စက်တင်ဘာ |
Created | 2019၊ 10 ဧပြီ |
ပုံစံ | |
လိုင်စင် | unspecified |
အမည် | Chapter 5: Potential environmental impacts and mitigation measures |
Resource's languages |
|
ဖော်ပြချက် | China Southern Power Grid Co., Ltd. develop hydro-power in Koh Kong. The study group from China chose two studies to study the feasibility of hydroelectric projects. According to the study, the hydroelectric power plant is capable of producing 108 MW of electricity and will require 4.5 years. The total investment cost is about USD 327 million. |