Cambodia: Greater Mekong Subregion Transmission Project

This report has 4 main sections namely project description, evaluation of design and implementation, evaluation of performance and overall assessment and recommendations. This project was estimated to cost $95.0 million, and ADB was to provide a loan for the equivalent $44.3 million from its Special Funds resources to finance 46% of the project cost. At the project completion, the cost cam to $76.0 million, of which ADB financed $38.9 million, or about 51%. The constructions actually commenced in January 2007 and were completed in November 2011.

Data Resources (1)

Data Resource Preview - Cambodia: Greater Mekong Subregion Transmission Project

Additional Info

Field Value
စာတမ်းအမျိုးအစား Reports, journal articles, and research papers (including theses and dissertations)
စာရွက်စာတမ်း၏ ဘာသာစကား
  • ခမာဘာသာစကား
ခေါင်းစဉ်များ Energy
ပထဝီဧရိယာ (spatial range)
  • ကမ္ဘောဒီးယား
မူပိုင်ခွင့် Yes
ရယူခြင်းနှင့် အသုံးပြုခြင်း အကန့်အသတ်များ

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ပြင်ဆင်ချက် 1.0
ခွင့်ပြုချက် CC-BY-SA-4.0
ဆက်သွယ်ရန်

Cambodia Resident Mission No. 29 Suramarit Blvd. (268/19) Sangkat Chaktomuk, Khan Daun Penh, Phnom Penh, Cambodia

Phone: + 855 23 215 805, 215 806, 216 417 Fax: + 855 23 215 807

ရေးသားသူ (အဖွဲ့) Asian Development Bank
ထုတ်ဝေသူ Asian Development Bank
ထုတ်ဝေသည့်ရက်စွဲ 2012
ဆက်ခံရရှိကြောင်းညွှန်းဆိုသည့်စာတမ်း ADB_Cambodia_Greater_Mekong_Subregion_Transmission__2012.pdf
တင်ခဲ့သည့်ရက်စွဲ ဇွန် 30, 2016, 01:02 (UTC)
ပြန်လည်ပြင်ဆင်သည့်ရက်စွဲ ဇူလိုင် 15, 2016, 07:54 (UTC)