Skip to content

ESIA: Lower Stung Russei Chrum Hydro-Electric Project in Koh Kong Province

This document is a part of the report of Environmental and Social Impact Assessment (ESIA) for Lower Stung Russei Chrum Hydro-Electric Project in Koh Kong Province developed by China Huandian Hong Kong Co.,LTD. There are two reservoirs, and GPS coordinates of those reservoirs are listed. The 1st reservoir has a size of 1,481 hectares with the water elevation 263 meters; the 2nd reservoir has a size of 155 hectares with the water elevation 108 meters.

Data Resources (1)

Data Resource Preview - ESIA: Lower Stung Russei Chrum Hydro-Electric Project in Koh Kong Province

Additional Info

Field Value
စာတမ်းအမျိုးအစား Profiles - Geographical areas and sites
စာရွက်စာတမ်း၏ ဘာသာစကား
  • ခမာဘာသာစကား
ပထဝီဧရိယာ (spatial range)
  • ကမ္ဘောဒီးယား
မူပိုင်ခွင့် Yes
ရယူခြင်းနှင့် အသုံးပြုခြင်း အကန့်အသတ်များ

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ပြင်ဆင်ချက် 1.0
ခွင့်ပြုချက် CC-BY-SA-4.0
ရေးသားသူ (အဖွဲ့) SAWAC Consultants for Development
ထုတ်ဝေသည့်ရက်စွဲ 2012
ဆက်ခံရရှိကြောင်းညွှန်းဆိုသည့်စာတမ်း ESIA__01.01.2012.pdf
တင်ခဲ့သည့်ရက်စွဲ ဖေဖော်ဝါရီ 29, 2016, 03:21 (UTC)
ပြန်လည်ပြင်ဆင်သည့်ရက်စွဲ ဇူလိုင် 14, 2016, 07:35 (UTC)