The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level and about 40m above the river. There are 5 turbine units with a capacity of 80MW each.
ข้อมูลเพิ่มเติม
ฟิลด์ | ค่า |
---|---|
ปรับปรุงครั้งล่าสุด | 4 ตุลาคม ค.ศ. 2021 |
สร้างแล้ว | ไม่ทราบ |
รูปแบบ | |
ใบอนุญาต | unspecified |
Name | 11. Annex [Part 2] |
Resource's languages |
|
Description | The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level and about 40m above the river. There are 5 turbine units with a capacity of 80MW each. |