Skip to content

transboundary-water-conflicts-a-case-study-yali-hydropower-dam-construction-in-vietnam

พิมพ์โดย: Open Development Mekong
A report about the challenges in assessing environmental impacts of large dams along international rivers, using the case study of the Yali dam. The author argues that the construction of the dam showed a failure to conduct a transboundary EIA compliant with international standards because of lacking technical capacity and political will from dam developers, as well as a weakness of the basin coordination unit. The severe negative consequences of the Yali Dam on Cambodian people downstream attracted the attention of the dam developers to re-conduct an EIA even if the construction was already underway. The results of the EIA prove that the dam heavily impacts communities in Cambodia; however, the dam developers in Vietnam offer limited compensation.

ทรัพยากรข้อมูล (1)

ตัวอย่างทรัพยากรข้อมูล - Transboundary water conflicts, a case study: Yali hydropower dam construction in Vietnam

ข้อมูลเพิ่มเติม

ฟิลด์ ค่า
ประเภทเอกสาร Reports, journal articles, and research papers (including theses and dissertations)
ภาษาของเอกสาร
  • ภาษาอังกฤษ
หัวข้อเรื่อง
  • Environmental and biodiversity protection
  • Environmental impact assessments
  • Water resources
  • Water rights
พื้นที่ทางภูมิศาสตร์ (ช่วงข้อมูล)
  • กัมพูชา
  • เวียดนาม
  • ลาว
  • ไทย
ลิขสิทธิ์ Unclear copyright
เวอร์ชั่น / รุ่น 1
ใบอนุญาต unspecified
ผู้แต่ง (บุคคล) Piseth Keo
จำนวนหน้า 17 p.
วันที่อัพโหลด พฤษภาคม 29, 2015, 09:08 (UTC)
แก้ไขเมื่อ มิถุนายน 23, 2015, 07:37 (UTC)