[Draft] Completed Environmental and Social Impact Assessment (ESIA) on the limestone business project of Kampot Cement Co., Ltd.

The main purpose of the business and use of limestone for processing into cement of Kampot Cement Co., Ltd. is to contribute to the development of sustainable construction and reduce poverty by reducing the cost of cement and increasing revenue. State people, especially those living near and around the project area, by providing employment, reducing migration, and increasing the time and quantity of development in the province, such as roads, bridges, and other constructions.

Data Resources (1)

Data Resource Preview - [Draft] Completed Environmental and Social Impact Assessment (ESIA) on the limestones business project in Kampot province.

Thông tin khác

Miền Giá trị
Vùng địa lý (phạm vi không gian)
  • Campuchia
Chủ đề
  • Environment and natural resources policy and administration
  • Environmental impact assessments
Loại tài liệu Environmental Impact Assessment
Các bên ký kết
  • Kampot Cement Co., Ltd (KCC)
Đối tượng thuộc chính phủ (nhiều)
  • Ministry of Environment
Tên nhượng quyền/giấy phép Kampot Cement Co., LTD (KCC)
Giấy phép Creative Commons Attribution Share-Alike
Bản quyền No
Hạn chế truy cập và sử dụng

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any liability against individuals or entities associated with its development, form, and content for any loss, harm, or damage suffered as a result of its use.

Phiên bản/ Ấn phẩm 1
Ngôn ngữ của tài liệu
  • Tiếng Khmer
(Các) Tỉnh
  • Kampot
Thông tin tham khảo Metadata.

Metadata last updated on 2018-08-03. For inquiries contact: Open Development Cambodia, Address: 23B St. 606, Phnom Penh, Cambodia. Email: contact@opendevcam.net, Website: http://www.opendevcam.net

Ngày ký 28 tháng 12, 2017
Liên hệ

SBK Research and Development Co., Ltd.

No.43 St.317 corner 572 Sangkat Beong Kak Ti Pir Khan Tuol Kouk , Phnom Penh

Khu vực được cấp phép 343.75
Điều khoản hợp đồng 5.0
Đơn vị điều khoản hợp đồng Years
Thanh toán phí nhượng quyền Year1: 400/year Year 2: 800/year Year 3: 1000/year
Thanh toán đơn vị phí nhượng quyền $/ha
Party's obligation in the implementation of the project

Kampot Cement Limestone Mining follows the modern Semi-Open Cut method, cutting from the center of the mountain and from top to bottom over an area of more than 343.75 hectares with a height of 10 meters, which takes 80 years to operate. Silo Oxide (SiO2) Limestone Excavation Site After clearing, site preparation, installation of the production line machinery, construction of the site structure, and access road construction, the company will plan for daily operations for quarrying limestone in 4 main stages, such as drilling & blasting, loading & hauling, crushing, and stocking.

Job creation summary

The company will need 212 direct workers for key jobs such as transportation, drilling, infrastructure, rock blasting, pre-mountain patrol, metering, and rock quality inspection.

Số lượng công việc được tạo 212.0
Training summary

All project staff will be trained to understand environmental-social issues and to understand their role under the company's environmental-social management plan. The training will ensure that each employee is well aware of his or her duties in carrying out his / her work with a high regard for environmental and occupational safety issues.

Phân bổ quỹ đào tạo 1000.0
Environmental protection obligation

An environmental management plan will be drawn up every six months, outlining data on the amount of solids, liquids, particles, sound, vibration, and control measures and facilities submitted to the Ministry of Environment for review. If necessary, the environmental management plan will be updated or revised to include issues of urgency, randomness, inspection, monitoring, and audit.

Socio-cultural protection

The company cooperates with local authorities to educate and guide employees to respect and love each other's cultural and religious traditions, especially the beliefs of local people. The company has measures to reduce the vibration that affects the temple and the artifacts in the temple, as specified in the point of sound and vibration. The company has identified a number of measures to restore and include. As for local life, For example, the company will repair damaged and noisy roads due to project activities. Clean all fluids and liquids from the construction site before closing the project in collaboration with the Provincial Department of Environment and the Provincial Department of Mines and Energy.

Tổng số tiền quỹ xã hội 2000.0
Environmental fund summary

The company has prepared a budget of USD 3,000/year for the first five years. The budget package is divided into two parts. The first phase, USD 1,000/year, is to help improve local environmental standards through education and promotion campaigns on solid waste storage and tree planting. Section 2 supports the headquarters of Meat Say village, roads, pagodas, and caves.

Tổng số tiền của quỹ môi trường 1000.0
Tài liệu tham khảo kế thừa Draft_ESIA_Kampot_Cement__28.12.2017.pdf
Các từ khóa limestone construction,Environmental and Social Impact Assessment (ESIA),Kampot Cement
Định danh hợp đồng mở ocds-miumsd-6f4baa82-05a6-423b-ab48-e503144091dd
Ngày đăng tải tháng 8 12, 2024, 03:59 (UTC)
Ngày chỉnh sửa, cập nhật tháng 1 30, 2025, 02:09 (UTC)