Draft summary report by His Excellency Dr. Suos Kong, Permanent Secretary of State
This draft document presents a summary report prepared by His Excellency Dr. Suos Kong, Permanent Secretary of State of the Ministry of Rural Development. It is associated with...
-
Environmental and social management planning framework for the National Rural Roads and Productivity Improvement Project (NRRPCP)
This framework establishes the environmental and social safeguards procedures for the National Rural Roads and Productivity Improvement Project (NRRPCP), implemented by the...
-
Environmental and social management plan and two environmental codes of practice for Package 1 subprojects (MRD–CASDP)
This compilation contains one Environmental and Social Management Plan (ESMP) and two Environmental and Social Codes of Practice (ESCOPs) prepared under the Cambodia...
-
Guidelines on mainstreaming climate change adaptation
This guideline provides direction for integrating climate change adaptation into rural development policies, plans, programmes, and activities. It aims to support the...
-
Environmental and social management plan for the Tuek Chenh–Ou Dounta Kraom DBST rural road subproject, Pailin province (WRR3 – Lot 6)
This Environmental and Social Management Plan (ESMP) was prepared for the WRR3 Lot 6 subproject to rehabilitate an existing 20.85-kilometre laterite road into a double...
-
Environmental and social management plan for the Boeng Praev–Chrouy Svay DBST and reinforced concrete road subproject (WRR3 – Lot 7)
This document presents the Environmental and Social Management Plan (ESMP) for the WRR3 Lot 7 rural road subproject connecting Boeng Praev and Chrouy Svay. The plan addresses...
-
Environmental and social management plan for the Kouk Banteay–Kang Meas DBST and reinforced concrete road subproject, Kampong Chhnang province (WRR3 – Lot 1)
This Environmental and Social Management Plan (ESMP) was prepared for the WRR3 Lot 1 subproject to upgrade the rural road connecting Kouk Banteay and Kang Meas in Rolea Bier...
-
Technical guidelines on small-scale energy
This technical guideline provides guidance on small-scale energy development and related technical considerations. It is intended to support understanding and application of...
-
Environmental and social management plan for the Chi Peang–Krasang DBST rural road subproject, Tbong Khmum province (WRR3 – Lot 5)
This document presents the environmental and social management plan for the WRR3 Lot 5 rural road subproject in Tbong Khmum province. It addresses potential environmental and...
-
Environmental and social management plan for the National Road No. 5–Kouk Kruos DBST rural road subproject, Kampong Chhnang province (WRR3 – Lot 2)
This document presents the environmental and social management plan for the WRR3 Lot 2 rural road subproject connecting National Road No. 5 to Kouk Kruos in Kampong Chhnang...
-
Environmental and social management plan for the Thma Totueng–Sampov Lun DBST rural road subproject, Tbong Khmum province (WRR3 – Lot 4)
This document presents the environmental and social management plan for upgrading an existing 11.684-kilometre laterite road into a double bituminous surface treatment (DBST)...
-
Environmental and social management plan for the Kansoam Ak–Chrak Svay DBST rural road subproject, Prey Veng province (WRR3 – Lot 3)
This document presents the environmental and social management plan for the Kansoam Ak–Chrak Svay rural road subproject under WRR3 Lot 3 in Prey Veng province. It addresses...
-
Environmental and social management plan for the NR No. 5 Tbaeng Mean Chey DBST rural road subproject (WRR4 – Lot 5)
This document presents the environmental and social management plan for the WRR4 Lot 5 rural road subproject associated with National Road No. 5 in the Tbaeng Mean Chey area. It...
-
Revised environmental and social management plan for the WWA2 Lot 1 rural road subproject, Kampong Chhnang province
This document presents the revised environmental and social management plan for the WWA2 Lot 1 rural road subproject in Kampong Chhnang province. It provides a framework for...
-
Revised environmental and social management plan for the WWA2 Lot 2 rural road subproject, Prey Veng province
This document presents the revised environmental and social management plan for the WWA2 Lot 2 rural road subproject in Prey Veng province. It provides a framework for...
-
Revised environmental and social management plan for the WWA2 Lot 3 rural road subproject, Tbong Khmum province
This document presents the revised environmental and social management plan for the WWA2 Lot 3 rural road subproject in Tbong Khmum province. It provides a framework for...
-
Monthly work progress report for May and work directions for June 2023 of the Ministry of Rural Development
This report summarizes the Ministry of Rural Development’s work progress and key achievements during May 2023. It also outlines the ministry’s planned activities and work...
-
Budget strategic plan 2023–2025 (BSP 2023–2025)
This document presents the Ministry of Rural Development’s Budget Strategic Plan for 2023–2025. It outlines the ministry’s medium-term budget priorities, planned programmes,...
-
Environmental and social management plan for the Phum Sambo–Phum Srea Anteak–Phum Phnompreal DBST rural road subproject, Pailin province (WRR4 – Lot 1, PLN2)
This document presents the environmental and social management plan for upgrading an existing 15.438-kilometre laterite road into a double bituminous surface treatment (DBST)...
-
Environmental and social management plan for the Chambak–Chan Mul DBST rural road subproject, Tbong Khmum province (WRR4 – Lot 2, TKM5)
This document presents the environmental and social management plan for the Chambak–Chan Mul rural road subproject in Tbong Khmum province under WRR4 Lot 2 (TKM5). It addresses...