Skip to content

Additional Information

Field Value
Last updated 29 ກັນຍາ 2021
Created 2 ສິງຫາ 2021
ຮູບແບບເອກະສານ PDF
ການອະນຸຍາດ License not specified
ຊື່ Webpage capture on the article of Royal Group to do study on 700MW power plant
ລາຍລະອຽດ

Webpage capture on the article of Royal Group to do study on 700MW power plant briefs on the feasibility study on a 700-megawatt coal-fired power plant in Preah Sihanouk province. The article was posted by Khmer Times on 18 June 2019.

ພາສາຂອງແຫຼ່ງຂໍ້ມູນ
  • ອັງກິດ