[Draft] Environmental and Social Impact Assessment (ESIA) Stung Pursat 1 hydroelectric project (80MV) in Veal Veng district Pursat province (BOT)
KTC Cable was registered in Seoul, South Korea on August 2005 and focus on electric and optical wire production for all telecommunication network. In 2006 this company received...
-
[Draft] Initial environmental and social impact assessment : Kamchay hydroelectric project in Kampot province
The Shinohydro is one of the leading company to utilize the water for producing electricity that has 10 subsidiaries and 70 network companies. The company won the international...
-
[Draft] Initial environmental and social impact assessment on Cheay Areng hydropower project in Koh Kong province
China Southern Power Grid Co., Ltd. develop hydro-power in Koh Kong. The study group from China chose two studies to study the feasibility of hydroelectric projects. According...
-
[Draft] Environmental and social impact assessment: Tatay hydroelectric project in Koh Kong province, Cambodia
The Tatay hydroelectric project of Koh Kong province was invested by Chinese company name Cambodian Tatay Hydropower Limited (CTHL) amounting USD 540 million and covering an...
-
[Draft] Environmental impact assessment for feasibility study of Lower Sesan 2 hydropower project, Stung Treng province, Cambodia
The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and...
-
[Draft] Environmental impact assessment for Lower Sesan 2 hydropower project in Stung Treng province, Cambodia
The length of the main dam is 8km with crest 83m above the sea level and 40m above the river. The Lower Sesan II is located in Sesan district, Stung Treng province, Cambodia...
-
Cambodia energy sector assessment, strategy, and road map
This sector assessment, strategy, and the road map (ASR) document the current analysis of the Asian Development Bank (ADB) analysis of the strategic investment priorities of...
-
Electricity generation plants
This dataset shows the 17 locations of electricity generation plants in 4 categories: hydropower plants, heavy fuel power plants, coal plants and plants using wood and other...
-
မြန်မာနိုင်ငံ နိုင်ငံတော်/ အမျိုးသားအဆင့် လျပ်စစ်ဓာတ်အားဖြန့်ဖြူးရေး ကွန်ယက်စနစ်
မြန်မာနိုင်ငံ နိုင်ငံတော်/အမျိုးသားအဆင့် လျပ်စစ်ဓာတ်အားဖြန့်ဖြူးရေးကွန်ယက်စနစ်ပြ မြေပုံတွင် မြန်မာနိုင်ငံ၌ လက်ရှိနှင့်အနာဂတ်ကာလ လျပ်စစ်ဓာတ်အားစနစ်ဖြန့်ဖြူးရေးလိုင်းများ၊ လျပ်စစ်...
-
Cambodia’s maiden Apsara oil field comes onstream
Phnom Penh, 29 December 2020 – KrisEnergy Ltd. (“KrisEnergy” or the “Company”) is pleased to announce that Cambodia’s first oil field in the offshore Cambodia Block A...
-
Access to clean fuel and technology for cooking
dataset တွင် မည်သည့်ဖော်ပြမှုမှ မပါရှပါ
-
Electrification (CLMTV)
dataset တွင် မည်သည့်ဖော်ပြမှုမှ မပါရှပါ
-
Hydropower Dams in Thailand
dataset တွင် မည်သည့်ဖော်ပြမှုမှ မပါရှပါ
-
Thermal coal plants in Vietnam by October 2020
dataset တွင် မည်သည့်ဖော်ပြမှုမှ မပါရှပါ
-
Krabi at the Crossroads: Dirty Coal VS. Clean Renewable Energy
Thailand is at the crossroads. With the political changes and turmoil affecting the country, we are now asking what energy future Thailand’s new governments will promote? Will...
-
Rural electrification by renewable energy in Cambodia
Power sector development policy was formulated in 1994, while energy strategic plan 1999-2016 was drafted and it was revised for 2004-2020. There is considerable potential of...
-
Annual report on power sector of the Kingdom of Cambodia 2012 edition
The Annual Report on Power Sector of the Kingdom of Cambodia 2012 Edition is compiled from informations for the year 2011 collected by EAC and information received from...
-
Decision on the 1st revision of the license document No. 050 LD issued to REECO Co., Ltd to provide electricity power service
Electricity Authority of Cambodia (EAC) issued license document no. 050 LD, dated on 09 Sept 2003, to REECO Co., Ltd for providing electricity power service to customers in...
-
Thailand Power Development Plan 2015-2036 (PDP2015)
In 2012, the Ministry of Energy (Thailand) together with the Electricity Generating Authority of Thailand (EGAT) prepared the Thailand Power Development Plan 2012-2030 (PDP2010...
-
Announcement No. 01 on the results of the Cambodian Cabinet Meeting on 05 April 2019
The government has approved SPHP (Cambodia) to invest in a new hydroelectric dam in Pursat river with capacity of 80-megawatt and built under a build-operate-transfer (BOT)...