Đi thẳng đến nội dung

Letters from theMEKONG TIME FOR A NEW NARRATIVE ON MEKONG HYDROPOWER

This issue brief – the second in Stimson’s “Letters from the Mekong” series – examines the current status of mitigation efforts at Laos’ Xayaburi and Don Sahong dam projects and the relevance of the existing narrative surrounding hydropower development on the river’s mainstream. Based on extensive research on the status and expected impacts of these projects, the authors of this brief have concluded that the current narrative of inev-itability surrounding the future of the Mekong is increasingly at odds with what is in fact a very fluid situation. Instead of being the first two of up to nine or eleven mainstream “dominos” to fall, these commercial-opportunity projects are likely to face significantly increasing political and financial risks and uncertainties.

Data Resources (1)

Data Resource Preview - etters from theMEKONG TIME FOR A NEW NARRATIVE ON MEKONG HYDROPOWER

Thông tin khác

Miền Giá trị
Loại tài liệu Reports, journal articles, and research papers (including theses and dissertations)
Ngôn ngữ
  • Tiếng Anh
Chủ đề Hydropower dams
Vùng địa lý (phạm vi không gian)
  • Lao People's Democratic Republic
Các (Tỉnh)
  • Xayabouly
Bản quyền Unclear copyright
Hạn chế truy cập và sử dụng

No known access and use constraints at the time of uploading

Phiên bản/Lần xuất bản 1
Giấy phép unspecified
Liên hệ

1211 Connecticut Avenue NW, 8th FloorWashington, DC 20036Tel: 202.223.5956 | Fax: 202.238.9604www.stimson.org

Tác giả (cá nhân) Stimson Center
Nơi xuất bản Laos
Nhà xuất bản Stimson Center.
Ngày xuất bản 2015
Đánh số trang 40
Ngày đăng tải tháng 5 18, 2018, 10:57 (UTC)
Ngày chỉnh sửa, cập nhật tháng 5 22, 2018, 03:33 (UTC)